matt_world2004
Established Member
- Joined
- 5 Nov 2014
- Messages
- 4,581
Terminal 5 westbound platform for heavy rail services.
Two facing connections at Bathgate, complete with signalling, for the never-built STVA sidings.
Lullingstone station. The platforms are still there.
https://en.m.wikipedia.org/wiki/Lullingstone_railway_station
Terminal 5 westbound platform for heavy rail services.
There is a line at London St Pancras that goes between the MML and the Eurostar tracks that looks like it has never been used
Tadcaster viaduct.
Built for an alternative route to York, the viaduct was completed but never saw service trains as the Church Fenton - York line took the traffic.
In the end it was used to access an industrial site just over the river.
Bletchley flyover almost counts too. Built for Varsity Line traffic that was closed soon after. Only very irregular use since for an expensive bit of infrastructure.
Any chance they could reopen that station in a miniature scale to serve the town?
It is only an exchange siding for infrastructure maintenance vehicles and it is occasionally used. (The alignment was used by passenger services as an interim arangment during the re-construction of St Pancras when Midland Mainline and Thameslink were terminating on the east side of the station that is now where the Southeastern platforms are. This was never intended to be permanent.)
Fratton freight siding. Put in after vigorous campaigning by a Portsmouth rail employee who argued there was container traffic from the dockyard & surrounding local industries currently going by road that was ideal for rail. I thought he was right,but we were wrong. I am told that in about 9 years not a single freight train has ever served the 2 tracks & lengthy hard standing.
I do wonder if the viaduct may yet be used for rail post HS2. Possibly it might make sense for the Midland Metro extension. But (without going too far off topic) I would have preferred it to be part of a through station solution for HS2 at Curzon Street.