• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Trivia: Most changes required between two stations operated by the same TOC

Status
Not open for further replies.

bb21

Emeritus Moderator
Joined
4 Feb 2010
Messages
24,461
This will change tomorrow, however, as through trains from the Cambrian Coast to Shrewsbury will end. This will mean that it will take a minimum of 4 changes to travel from somewhere like Barmouth to Cardiff Bay by train, changing at stations such as Machynlleth, Shrewsbury, Cardiff Central and Cardiff Queen Street.

There is one direct Cardiff Central - Bay service on Sundays, and one in the opposite direction on Mondays to Saturdays in the new timetable.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
There is one direct Cardiff Central - Bay service on Sundays, and one in the opposite direction on Mondays to Saturdays in the new timetable.

Same as last Timetable. Posutioning move rather than just run ECS
 
Last edited:

kieron

Established Member
Joined
22 Mar 2012
Messages
3,282
Location
Connah's Quay
There is one direct Cardiff Central - Bay service on Sundays, and one in the opposite direction on Mondays to Saturdays in the new timetable.
Do you know if it works as a through service on the ground, rather than a Cardiff Central-Cardiff Queen Street service which happens to use the same unit as the next Cardiff Queen Street-Cardiff Bay one?

I notice that two sections were shown as separate services in the last NR timetable. It's the same in the current NR timetable, either, but as that misses table 130A out altogether this may not mean too much. The ATW Valleys timetable doesn't appear to show the train at all before it reaches Cardiff Queen Street.

If it is a through service, it just means the minimum number of changes between any pair of ATW stations is at most 3 now, up from 2.
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
Do you know if it works as a through service on the ground, rather than a Cardiff Central-Cardiff Queen Street service which happens to use the same unit as the next Cardiff Queen Street-Cardiff Bay one?

I notice that two sections were shown as separate services in the last NR timetable. It's the same in the current NR timetable, either, but as that misses table 130A out altogether this may not mean too much. The ATW Valleys timetable doesn't appear to show the train at all before it reaches Cardiff Queen Street.

If it is a through service, it just means the minimum number of changes between any pair of ATW stations is at most 3 now, up from 2.

RTT has them down as through services:
2S72 SSuX 2354 Cardiff Bay-Cardiff Central
2B24 SuO 0854 Cardiff Central-Cardiff Bay

That implies they have the same headcode throughout, which is what a lot of people seem to use as the yardstick (e.g. to determine when loop services change destination etc).
 

kieron

Established Member
Joined
22 Mar 2012
Messages
3,282
Location
Connah's Quay
That implies they have the same headcode throughout, which is what a lot of people seem to use as the yardstick (e.g. to determine when loop services change destination etc).
I know that they both have. I was wondering because the Cardiff Bay-Cardiff Central and Coryton-Cardiff Bay trains are advertised in the timetable as through services, but that one isn't.
 
Status
Not open for further replies.

Top