There do seem to be pen marks through up main / down main and P1-3, but the carriage sidings which you mentioned, and were thus the area my comments referred to, are just shown as electrified.
Note the '
There do seem to be pen marks through up main / down main and P1-3, but the carriage sidings which you mentioned, and were thus the area my comments referred to, are just shown as electrified.
Though quite why he'd try to be smirk about my own map which I filled in with my own hand is beyond me lol.Given the tone of your comments else where on the site I assumed it was a smug smirk.:?
Though quite why he'd try to be smirk about my own map which I filled in with my own hand is beyond me lol.
God dammit Jamie, it was not your own hand...![]()
I was told it was Colchester

this is starting to feel like deja-vu all over again...
Not sure its been posted, But Gloucester is Designed to hold 2 2+8 HST's
Useless fact but it may come in handy![]()
Yes, the combined length of platforms 1 and 2 at Gloucester is 494m.
Combined length of platforms 1 and 4 at Cambridge is 467m.
Longest single platform seems to be Darlington platform 4 at 458m.