Part Time Spotter has started reporting 231 movements. ECS so training or testing but that has been going on for months so I feel passenger service is imminent (just clutching at straws but they are Stadlers).
 

Kyle2

Member
Joined
2 Sep 2020
Messages
25
Location
Barry
Rhymney Line. Until the 756s are introduced then will move onto the mainline.
If the 231's are working Rhymney until the 756's come in, then what's going to be working the Ebbw Vales and Cheltenham's until then? Aren't the 170's meant to be going to EMR early next year?
 

AdamWW

Established Member
Joined
6 Nov 2012
Messages
6,031
If the 231's are working Rhymney until the 756's come in, then what's going to be working the Ebbw Vales and Cheltenham's until then? Aren't the 170's meant to be going to EMR early next year?

If they have more than enough to replace the 769's then that should free up some 150's.
 

Richard Scott

Established Member
Associate Staff
International Transport
Railtours & Preservation
Joined
13 Dec 2018
Messages
4,584
If they have more than enough to replace the 769's then that should free up some 150's.
Great, just what's needed, those old bangers. They might work but as far as passenger comfort is concerned they're well past their sell by date.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
If the 231's are working Rhymney until the 756's come in, then what's going to be working the Ebbw Vales and Cheltenham's until then? Aren't the 170's meant to be going to EMR early next year?
The plan appears to be for a mixture of 150s and 175s, both in turn released by the introduction of further MKIVs and 197s
Great, just what's needed, those old bangers. They might work but as far as passenger comfort is concerned they're well past their sell by date.
Can you suggest a better alternative?
 

Kyle2

Member
Joined
2 Sep 2020
Messages
25
Location
Barry
Also, might be off topic, but are drivers being trained to do the Vale of Glamorgan line on the 231's? I know they're stabled in Barry, but would they work passenger services until the 756's start? I'm just thinking that if the trams start before the Rhymney is finished, all MER/TRB/ABA services would have to terminate in Cardiff, as the metro plan states. Electrification work has only just started on the Rhymney, so that's probably going to be completed later and I assume the 756's won't have the battery range to do the whole journey from Rhymney to Bridgend/Barry Island?
 

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,998
Also, might be off topic, but are drivers being trained to do the Vale of Glamorgan line on the 231's? I know they're stabled in Barry, but would they work passenger services until the 756's start? I'm just thinking that if the trams start before the Rhymney is finished, all MER/TRB/ABA services would have to terminate in Cardiff, as the metro plan states. Electrification work has only just started on the Rhymney, so that's probably going to be completed later and I assume the 756's won't have the battery range to do the whole journey from Rhymney to Bridgend/Barry Island?
They have diesel engines as well as batteries and pantographs ('tri-mode'').
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
Also, might be off topic, but are drivers being trained to do the Vale of Glamorgan line on the 231's? I know they're stabled in Barry, but would they work passenger services until the 756's start? I'm just thinking that if the trams start before the Rhymney is finished, all MER/TRB/ABA services would have to terminate in Cardiff, as the metro plan states. Electrification work has only just started on the Rhymney, so that's probably going to be completed later and I assume the 756's won't have the battery range to do the whole journey from Rhymney to Bridgend/Barry Island?
Drivers don't normally get specific training for working a new traction on a particular route. Once they're qualified to drive a particular train, they're qualified to drive it on any route that they sign. So in this case, the Valleys drivers learning the Stadlers on the Rhymney valley line will then be qualified to drive them to Barry Island. When Cardiff Mainline drivers learn Stadlers they'll then be able to drive them to Bridgend via the VOG.
 

Roger B

Established Member
Joined
16 Jun 2018
Messages
1,288
Location
Gatley
Drivers don't normally get specific training for working a new traction on a particular route. Once they're qualified to drive a particular train, they're qualified to drive it on any route that they sign. So in this case, the Valleys drivers learning the Stadlers on the Rhymney valley line will then be qualified to drive them to Barry Island. When Cardiff Mainline drivers learn Stadlers they'll then be able to drive them to Bridgend via the VOG.
Thanks Craig.

In some ways I can see the logic of this: a driver holds route cards for those they're authorised to drive, and traction cards for what they're authorised to drive.

BUT, new traction types will have different chatacteristics - eg acceleration and braking characteristics - giving rise to changes to where and when to apply power, and how much, where to apply brakes (especially where stopping marker boards are in different places) on the routes they're allocated to. So whilst no hands-on training, are there classroom / video / simulator activities so drivers can master new traction over existing routes?
 

Nick Ashwell

Member
Joined
20 Dec 2018
Messages
463
The plan appears to be for a mixture of 150s and 175s, both in turn released by the introduction of further MKIVs and 197s

Can you suggest a better alternative?
Not making South Monmouthshire suffer like every other time? Why do we get a downgrade when Rhymney gets an upgrade with trains meant for our services?

We have to fight for buses, if you want to leave after 620 and get to work on time you'd better get the XC. We're sort of fed up with being messed about by every public transportation decision and yet they refuse to build us a bypass in Chepstow. We honestly can't win!!!
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
Thanks Craig.

In some ways I can see the logic of this: a driver holds route cards for those they're authorised to drive, and traction cards for what they're authorised to drive.

BUT, new traction types will have different chatacteristics - eg acceleration and braking characteristics - giving rise to changes to where and when to apply power, and how much, where to apply brakes (especially where stopping marker boards are in different places) on the routes they're allocated to. So whilst no hands-on training, are there classroom / video / simulator activities so drivers can master new traction over existing routes?
It would be nice, but in practice the different permutations of stock and routes makes it impractical for a driver to learn every route on every traction. When they learn a new traction they can feel how it compares to the other trains they drive and adapt their style accordingly for each route.

There may be notices posted advising on different stopping points, but otherwise drivers are trusted to cope. They may drive a little more cautiously the first few times, but from what I've heard it's not hard to keep to 150 timings driving a Stadler.
Not making South Monmouthshire suffer like every other time? Why do we get a downgrade when Rhymney gets an upgrade with trains meant for our services?

We have to fight for buses, if you want to leave after 620 and get to work on time you'd better get the XC. We're sort of fed up with being messed about by every public transportation decision and yet they refuse to build us a bypass in Chepstow. We honestly can't win!!!
That would be a no then.
 

berneyarms

Established Member
Joined
26 Nov 2013
Messages
3,115
Location
Dublin
Not making South Monmouthshire suffer like every other time? Why do we get a downgrade when Rhymney gets an upgrade with trains meant for our services?

We have to fight for buses, if you want to leave after 620 and get to work on time you'd better get the XC. We're sort of fed up with being messed about by every public transportation decision and yet they refuse to build us a bypass in Chepstow. We honestly can't win!!!
Let’s be fair - Rhymney has had to put up with serious problems with Class 769 reliability since their introduction.

They have hardly had it easy!
 

Nick Ashwell

Member
Joined
20 Dec 2018
Messages
463
Let’s be fair - Rhymney has had to put up with serious problems with Class 769 reliability since their introduction.

They have hardly had it easy!
And the Gloucester to Newport line has had mass XC cancellations!

What I'm saying is downgrading your product in one area just to upgrade it to another is silly.

Frankly, TfW should not be giving up the 170s, then there'd be no issue introducing 231s ON Rhymney services. But, it's the Welsh government, and not voting for further devolution means you should have worse public services and the highest taxes!!
 

el_lnrd

Member
Joined
17 Dec 2019
Messages
29
Location
Cardiff
And the Gloucester to Newport line has had mass XC cancellations!

What I'm saying is downgrading your product in one area just to upgrade it to another is silly.

Frankly, TfW should not be giving up the 170s, then there'd be no issue introducing 231s ON Rhymney services. But, it's the Welsh government, and not voting for further devolution means you should have worse public services and the highest taxes!!
Totally agree with you. XCs Cardiff-birmingham route has suffered from mass cancellations. Very limited options to go from Gloucester/Cheltenham to South Wales. Plus their turbostars are honestly a disgrace, the seats are dirty and completely distroyed on par with the rest of the train.

Seeing that the class 170 are going away is very frustrating given they were nice trains to travel on and that a new traction replacements for the 150 to be dominated service will now not come before a very long time. We were also supposed to get a full one train per hour service from december 2023 but again this has been dropped. Anyway I suppose it is not the right place for this...
 

Anonymous10

Established Member
Joined
19 Dec 2019
Messages
2,635
Location
wales
Not making South Monmouthshire suffer like every other time? Why do we get a downgrade when Rhymney gets an upgrade with trains meant for our services?

We have to fight for buses, if you want to leave after 620 and get to work on time you'd better get the XC. We're sort of fed up with being messed about by every public transportation decision and yet they refuse to build us a bypass in Chepstow. We honestly can't win!!!
take a try living in west wales, however the 769s are unreliable and causing short forms across the network by sucking up 150s and 153s onto the line by replacing them with 231s everyone can get a service
 

penguin8967

Member
Joined
21 Aug 2020
Messages
136
Location
South West
If the 231's are working Rhymney until the 756's come in, then what's going to be working the Ebbw Vales and Cheltenham's until then? Aren't the 170's meant to be going to EMR early next year?
I believe TfW don't have enough 170s left now (only have the 3 coach ones) to cover all Maesteg/Ebbw Vale/Cheltenham services - it's becoming increasingly common for a 150 or pair of 153s to pop up on these now (see screenshot below).

1670620717058.png
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,641
Location
South Staffordshire
Frankly, TfW should not be giving up the 170s, then there'd be no issue introducing 231s ON Rhymney services. But, it's the Welsh government, and not voting for further devolution means you should have worse public services and the highest taxes!!
I suspect it is DfT telling TfW that they wouldnt be keeping the 170s.
EMR is THE up and coming operator hence why DfT are swinging 170s towards them as much as possible.

In my view all the new rolling stock types will be come a millstone round the necks of the Senedd. Class 197 231 398 and 756 as well as more Mk4s will make TPE's triple traction sem like a walk in the park, as well as stabling all the trains in the conversion from to new. I presume Barry will fuldfil the role that the MNR new sidings did for the Stadler fleet in Anglia.

What are the usage differences between 231 and 756 ? And once electrified are there distinct routes for 398s or 756s, or will there be dual operation under the OLE ?
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
I suspect it is DfT telling TfW that they wouldnt be keeping the 170s.
TfW is fully devolved to the Welsh Government. I'm more suprised that the 170s were on such a short lease.
What are the usage differences between 231 and 756 ? And once electrified are there distinct routes for 398s or 756s, or will there be dual operation under the OLE ?
231s have more engines (I think) and no pantograph. Class 756s have batteries as well.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,869
TfW is fully devolved to the Welsh Government. I'm more suprised that the 170s were on such a short lease.
They weren't on a short lease according to TfW's Rolling Stock Minimum Requirements and Specifications published at/near/for the start of the 15 year KeolisAmey franchise - in fact they appear to have been on the longest lease of any of the TfW fleets (even the brand new stock was only leased until the end of the franchise, the 170s appear to have been leased beyond the end of the franchise).
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
What are the usage differences between 231 and 756 ? And once electrified are there distinct routes for 398s or 756s, or will there be dual operation under the OLE ?
398s are tram trains, and specifically for Treherbert/Aberdare/Merthyr services as some of these will be running to Cardiff Bay, and at the time of ordering there was a plan to extend the branch line there as a tramway. 756s are proper heavy rail only trains, and will be running Rhymney/Coryton to Penarth/Barry Island/Bridgend via VOG services

== Doublepost prevention - post automatically merged: ==

TfW is fully devolved to the Welsh Government. I'm more suprised that the 170s were on such a short lease.
They weren't on a short lease according to TfW's Rolling Stock Minimum Requirements and Specifications published at/near/for the start of the 15 year KeolisAmey franchise - in fact they appear to have been on the longest lease of any of the TfW fleets (even the brand new stock was only leased until the end of the franchise, the 170s appear to have been leased beyond the end of the franchise).
The 170s were meant to be staying the length of the franchise, but were rather oddball units in the fleet. To keep them it would have involved a lot of work on gauge clearance and crew training. Sending them to EMR gets them out of this problem, and benefits EMR at the same time who are desperate to get their hands on as many 170s as possible.

In their place TfW have taken on extra MKIVs, and held on to a few 153s. This requires much less training and gauge clearance work.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,832
Location
Croydon
It would be nice, but in practice the different permutations of stock and routes makes it impractical for a driver to learn every route on every traction. When they learn a new traction they can feel how it compares to the other trains they drive and adapt their style accordingly for each route.

There may be notices posted advising on different stopping points, but otherwise drivers are trusted to cope. They may drive a little more cautiously the first few times, but from what I've heard it's not hard to keep to 150 timings driving a Stadler.

That would be a no then.
From what I have seen of the 231 runs they regularly get tens of minutes ahead of the timings so I assume they have plenty of power for acceleration or speed.
 

Top