006 and 010 are out today. 007 and 009 have worked this week too. Hopefully that means all five can be regularly available again soon
Indeed, as per the established discussion here.The train operator GWR has been trialling a pure battery version of these Class 230 trains and things have gone so well that they plan to put it in to passenger service.
Admittedly it will be on a short branch line but part of their trails have included a fast charge system at one station.
007 failed yesterday with battery issues006 and 010 are out today. 007 and 009 have worked this week too. Hopefully that means all five can be regularly available again soon
I think it might have been 5T08, based on going to Birkenhead.230 008 has been to Crewe - this Tweet / X post includes some photos
Yes that is it!I think it might have been 5T08, based on going to Birkenhead.
Realtime Trains | 5T08 1650 Crewe T.M.D. (E) to Birkenhead North E.M.U.D | 29/10/2025
Real-time train running information for 5T08 1650 departure from Crewe T.M.D. (E) to Birkenhead North E.M.U.D on 29/10/2025. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
They go to Crewe to visit the wheel lathe.Yes that is it!
Is it known why 230 008 went there?
Previous post from sd0733 suggests that it was to receive attention on the wheel lathe.Yes that is it!
Is it known why 230 008 went there?
Timetable meltdown was actually caused by 197011 ‘problem with the brakes’There have been numerous of faults and failures recently, too many to mention. However today there was big disruption due to one failing and having to be towed away. Made a mess of the morning timetable
2J50 was used as a rescue train. The 197 was i believe behind the failed 230.Timetable meltdown was actually caused by 197011 ‘problem with the brakes’
Realtime Trains | 2J48 0722 Bidston to Penyffordd | 14/11/2025
Real-time train running information for 2J48 0722 departure from Bidston to Penyffordd on 14/11/2025. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
Next service 230010 thrown off by failure of the 197 above,
Realtime Trains | 2J50 0806 Bidston to Hawarden Bridge | 14/11/2025
Real-time train running information for 2J50 0806 departure from Bidston to Hawarden Bridge on 14/11/2025. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
Further service cancellations hung off problems of first service.
Do you have any further information that is not shown on RTT, would be interesting to see if these issues could be clarified further.
Thanks for the clarification. Strange that RTT has problem with the brakes against the 197, good to know what actually happened.230007 i believe failed somewhere near Cefn Y Bedd losing all power and was stranded between stations, it had to be rescued by 230010. Ive not heard of one having to be properly rescued yet so not ideal.
== Doublepost prevention - post automatically merged: ==
2J50 was used as a rescue train. The 197 was i believe behind the failed 230.
This was the offending service.
Realtime Trains | 2J46 0647 Bidston to Wrexham General | 14/11/2025
Real-time train running information for 2J46 0647 departure from Bidston to Wrexham General on 14/11/2025. From Realtime Trains, an independent source of train running info for Great Britain.www.realtimetrains.co.uk
It shows arriving at Wrexham 30 odd late, but it didnt actually get there apparently.
From what I've heard, they're now bi-lingual with Eryl doing the Welsh and Elin doing the English (basically the same as the Mark 4/197/231/756 announcements, but specifically like the new 153 ones, with both the 153s and 230s using the TrainFX system).Announcements on the 230s seem to have changed to the standard TFW announcements
No amount of new announcements will compensate for their dire reliability and therefore inconvenience to passengers. More cancellations and replacement bus services this morning due to failed units.Not commented for a while but nothing has changed, the 230s are as bad as ever and only 2 a day working. About the announcements yes they have changed but they never work properly anyway because it always gets confused at Hawarden Bridge and loses the order, i think the conductor has to start it again all the time. I await the usual comments and excuses about how good they will be and it’s not the trains fault. The line is doomed while the 230s are around and wasting millions.
Interesting, because up until now the messaging has been that the trial has gone extremely well. Yet this seems to be quite a big issue, how big depending, I guess, on how often the balancing process needs to happen.December Modern Railways has a piece on trials of new batteries for these, intended to require less downtime for balancing usage of individual units within a battery pack - "reduced from 30 hours to nine hours".
From the same source (Rhodri Clark reporting TfW), was every three days, now every six days.depending, I guess, on how often the balancing process needs to happen
Not sure which unit it is, but its had artwork applied with various landmarks from the route. I think it looks quite good!Looks like one of them has had a livery like the active travel sets put on, i saw it but didn't get a pic
008 has been away for a while so that would make senseI recently saw a photo of this on Twitter / X, but now cannot find it.
It shows the side of the train from one end with the following number on it: 300008, which makes me think of unit 230 008.
I saved the photo on my computer but for copyright reasons cannot make it public. I suppose that I could share in privately.
Simon
"Positive discussions suggesting a joint venture between transport operators in Wales and on Merseyside will lead to direct Wrexham-Liverpool services."
I doubt it!Has the livery made it more reliable?
I think the renaming idea has come from the Welsh side.Found a photo from the Rail Magazine article:
Article Here
![]()
== Doublepost prevention - post automatically merged: ==
Steve Rotherham has also taken this as an opportunity to rename the line to the 'Wrexham to Liverpool' line and the promotional video doesn't even show a single picture of the newly wrapped train, never mind the confusion as naming a line that dosen't go to Liverpool as if it does.
Investment is already planned to address the issues that place timetabling constraints.Not to be too off-topic but if I remember dosen't Wrexham-Bidston have some really large signalling blocks that would make any idea of a 'Merseyrail Metro' a bit far fetched? Also was that not a reason why TfW could not do any better than 1 per 45 minutes from 1 per hour instead of 1 per 30 minutes?