Nope. An emergency excercise was held in standedge involving those sets.Looks like potentially some testing was done today, 185144 and 150 went up and entered the T3 beyond Marsden at 0900 this morning and are due back out at 1630
As part of the multi-billion-pound Transpennine Route Upgrade, we will be carrying out a series of improvements between Leeds and Neville Hill on Easter Sunday - and the newly-reinforced line through Castleford will help us keep passengers moving while we carry out this work.
Teams of engineers will install new overhead line equipment and two new pipelines beneath the track to safely carry signalling cables beneath the line. They will also be carrying out surveys of the ground and structures along the railway.
This essential work will allow the future re-modellng of the track layout and support the electrification of the line east of Leeds, enabling faster, quieter, greener and more frequent trains on this key line linking the cities of York, Leeds and Manchester.
Passengers can keep their plans on track while this work takes place throughout Easter Sunday (Sunday 9 April) as the majority of trains between Leeds and York, and Leeds and Hull will continue to run via the Castleford route, with rail replacement buses serving local intermediate stations between Leeds and York, and Leeds and Selby, to ensure people can get to and from where they want to go.
People planning to catch the train should check before they travel via National Rail Enquiries or their train operator for the latest updates.
Over the last two years, the Castleford line has undergone major work to make it more resilient, with new track, improved signalling and a new entrance in and out of Holbeck depot to remove congestion and increase capacity. The improvements will be on show this Easter as the line is used as a vital diversion route, carrying an additional two trains per hour.
Dunno, but 2M70 has just left Greenfield bang on timeCredit where credit is due, the 0711 arrival in to MAN wasn’t cancelled and arrived 1 minute early in fact. Pretty good for the first day running after the works. I’m sure normal TPE service will resume shortly though
Anyone know why RTT has no data for Greenfield and Mossley (“no report”) for the first couple of services this morning? Were they skipped?
The Transpennine Route Upgrade continues to build towards the future of electric rail travel in the North, as industry leaders hail the latest upgrade work at Stalybridge station.
Engineers worked around the clock over 26-days to complete their largest phase of work to date, including a full junction remodelling, installing over 2km of new track and 23 new signals, upgrading 13 crossovers and fitting new overhead line equipment for future electrification, which will improve journeys along this key route.
As well as full resignalling of the Stalybridge area itself, the line from Stalybridge to DiggleAnyone know why RTT has no data for Greenfield and Mossley (“no report”) for the first couple of services this morning? Were they skipped?
Post #6407, if i understand correctly means that 50mph can be maintained through Stalybridge and onwards where as before the speed limit reduced to 25mph. From previous posts today it looks like trains are back running normally.Are trains heading towards Manchester Victoria running at 50mph today?
I ask as initially trains using the realigned Miles Platting Curve ran at the old 30mph limit before adopting the 55mph limit.
So at the new limit to the west of the station?From previous posts today it looks like trains are back running normally.




I think the Stoke area was also remodelled twice during WCRM
Does that mean Diggle signal box is now out of use?As well as full resignalling of the Stalybridge area itself, the line from Stalybridge to Diggle
has also been 'recontrolled' to Manchester ROC with new berth numbers, hence the lack
of data which relied on the old berth numbers.
If I remember properly, the initial work was from an early Railtrack design around Longport, and replicated all the slow crossovers in the area.fairly sure that‘s not the case.
I rode the line yesterday (Bolton - Stalybridge then Mossley) and noted we arrived slightly early!! As an aside I think the 6 minutes scheduled between arrival and the arrival of the stopping train towards Huddersfield is a bit tight, especially as one has to transfer from Platform 2 to 3 (which nearly caught out fellow Bury fans) - would love to know why the stopping train can't arrive on P2 > although I think a fast train "overtakes" it using 2?Had a visit to Stalybridge yesterday to observe the changes sin the 26 day closure.
Lotts of metal has gone up but plenty more to errect
View attachment 132501View attachment 132502View attachment 132503View attachment 132504View attachment 132505
The press release in #6461 saysAnyhow, back to the works, when will the wires be put in, and how long will that take, and will the line be closed again??
but that may not mean wires. There are still some supports to go in.Additional follow up work will also take place at Stalybridge on 15/16 April, 22/23 April, 29/30 April and 20/21 May. Passengers should check before they travel for the latest updates.
Okay, so wires over the summer (?), hopefully weekends and avoid the lengthy closure?The press release in #6461 says
but that may not mean wires. There are still some supports to go in.
I'm fairly sure that nothing was done with platform 1 at Stoke-on-Trent; the up main as was was removed and the platform line became the up main. The old up main and down lines were 30mph but the turnout into the up platform was 15mph. The up pointwork was removed and the down & up main (platform 2) is now 40mph whereas the up main (platform 1) is 45mph with 30mph in the down direction.If I remember properly, the initial work was from an early Railtrack design around Longport, and replicated all the slow crossovers in the area.
There was then a second build which swept away all that (mostly redundant) and increased the linespeed.
There was also the re-visit at Stoke itself to build out P1 onto the former through line, also permitting a linespeed increase.
From memory these rebuilds were ordered by the SRA to improve on the "like for like" Railtrack renewals.