Transpennine Freight Route Feedback

Status
Not open for further replies.

Legolash2o

Member
Joined
27 Sep 2018
Messages
687
I've been looking into options for a W10/W12 gauge cleared route through the Transpennines (Calder).

The route I'm thinking is from Doncaster -> Wakefield -> Mirfield -> Sowerby Bridge -> Lostock Hall Junction.

A new junction would have to be created between Lostock Hall and line to Ormskirk. Both tracks at Ormskirk would have to be re-connected and finally an old tunnel near Bootle Jn would have to be re-instated.

Does anyone see any issues with this idea? It's option Preston 2 on the link below.
https://railmap.azurewebsites.net/Public/Upgrade (7am to 9pm only)

Thanks.
Preston2.png
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Clip

Established Member
Joined
28 Jun 2010
Messages
10,821
Is there demand for such a route between the two points on each coast?
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,482
Location
Preston Lancs
I love it - especially if electrified throughout. Loads of little infills such as Nelson - Colne etc would get electrified passenger services too. Also, reinstate the curves at Burscough Junction and you can have Preston etc- Southport passenger services. I love it.
 
Last edited:

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,900
Your plans stands no chance as Merseyside will not allow any new freight over lines they now have exclusively for passenger use.
 

Legolash2o

Member
Joined
27 Sep 2018
Messages
687
Isnt it quite difficult for heavily loaded freight trains to get over copy pit?

I will check the trailing weights later as I have another map with them on.

Your plans stands no chance as Merseyside will not allow any new freight over lines they now have exclusively for passenger use.

That's a shame, the alternative is Preston 1.

I love it - especially if electrified throughout. Loads of little infills such as Nelson - Colne etc would get electrified passenger services too. Also, reinstate the curves at Burscough Junction and you can have Preto etc- Southport passenger services. I love it.

Thanks. I've tried to avoid busy passenger routes including Leeds Whitehal Jn and Manchester Victoria. I couldn't avoid Wakefield though! I'm assuming the Burscough Jn you mentioned was the one near Lostock?
 
Last edited:

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,482
Location
Preston Lancs
I'm assuming the Burscough Jn you mentioned was the one near Lostock?

No, going south from Preston Station - the line goes to Ormskirk and also Blackburn and that junction needs work regardless. Continue south going to Ormskirk and before there you come to Burscough. If you reinstated the curves there you could run a Preston (or Blackpool South or BPL North or Colne etc) -Southport passenger service.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Your plans stands no chance as Merseyside will not allow any new freight over lines they now have exclusively for passenger use.

Not Merseyrail or Merseytravel's perogative to dictate who can and can't access the Network Rail network if the track capability and timetable capacity is there. It's for Network Rail and the ORR to determine.

Merseyrail/travel would no doubt be concerned about it, but they can't block it (unless they had some very convincing evidence about why it couldn't work)
 

chorleyjeff

Member
Joined
3 May 2013
Messages
677
Your plans stands no chance as Merseyside will not allow any new freight over lines they now have exclusively for passenger use.

Is there no strategic overview and could provision not be made when the franchise is next awarded ?
 

chorleyjeff

Member
Joined
3 May 2013
Messages
677
I've been looking into options for a W10/W12 gauge cleared route through the Transpennines (Calder).

The route I'm thinking is from Doncaster -> Wakefield -> Mirfield -> Sowerby Bridge -> Lostock Junction.

A new junction would have to be created between Lostock Hall and line to Ormskirk. Both tracks at Ormskirk would have to be re-connected and finally an old tunnel near Bootle Jn would have to be re-instated.

Does anyone see any issues with this idea? It's option Preston 2 on the link below.
https://railmap.azurewebsites.net/Public/Upgrade

Thanks.
View attachment 58527

A pedant point. Lostock Junction is near Bolton. I think you are referring to Lostock Hall where a short stretch of former line would be need to be reinstated and connected by two junctions to existing lines.
 

Legolash2o

Member
Joined
27 Sep 2018
Messages
687
No, going south from Preston Station - the line goes to Ormskirk and also Blackburn and that junction needs work regardless. Continue south going to Ormskirk and before there you come to Burscough. If you reinstated the curves there you could run a Preston (or Blackpool South or BPL North or Colne etc) -Southport passenger service.

Ah yes, found it!

Not Merseyrail or Merseytravel's perogative to dictate who can and can't access the Network Rail network if the track capability and timetable capacity is there. It's for Network Rail and the ORR to determine.

Merseyrail/travel would no doubt be concerned about it, but they can't block it (unless they had some very convincing evidence about why it couldn't work)

Well according to level crossing data, there's only 34 trains per day on the Ormskirk route, compared to Hull/Gilberdyke (146), Manchester Ordsall Lane Jn to Parkside Jn (174) and other places with 250+. Improving it for freight could include double-tracking enable more passenger capacity and new services from Liverpool to Preston, Edinburgh or a alternative Manchester Victoria route.
 

Legolash2o

Member
Joined
27 Sep 2018
Messages
687
A pedant point. Lostock Junction is near Bolton. I think you are referring to Lostock Hall where a short stretch of former line would be need to be reinstated and connected by two junctions to existing lines.
Fixed it, thanks.
 

Legolash2o

Member
Joined
27 Sep 2018
Messages
687
View attachment 58549 I drew in by hand the curves I meant

That's cool. Thanks for the info.

Isnt it quite difficult for heavily loaded freight trains to get over copy pit?

Copy Pit (East to West) allows a class 66H to have a trailing weight of 3510 tonnes.
TrailingWeight-Copley.png

West to East between Preston to Todmorden only allows 2230 tonnes.
TrailingWeight-Preston.png

Not sure if these are an issue for inter-modal freight such as high-cube?
 

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,900
Not Merseyrail or Merseytravel's perogative to dictate who can and can't access the Network Rail network if the track capability and timetable capacity is there. It's for Network Rail and the ORR to determine.

Merseyrail/travel would no doubt be concerned about it, but they can't block it (unless they had some very convincing evidence about why it couldn't work)
Technically correct but they haven't spent years developing a "Merseyside Metro", by severing connections like Ormskirk and Kirkby, to have it breached by freights without a major fight.
 
Last edited:

Legolash2o

Member
Joined
27 Sep 2018
Messages
687
So they purposely broke up Ormskirk? That seems like backward thinking! Surely it reduces options for passengers and a loss of profits?

I bet a TOC would earn more having a Preston to Liverpool via Ormskirk rather than Preston to Ormskirk then another train from Ormskirk to Liverpool. Why have two trains? What if one train breaks down or fails to even turn up?

I'm sure I read once that the Ormskirk services get cancelled frequently as well.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,256
Location
Yorkshire

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,900
So they purposely broke up Ormskirk? That seems like backward thinking! Surely it reduces options for passengers and a loss of profits?

I bet a TOC would earn more having a Preston to Liverpool via Ormskirk rather than Preston to Ormskirk then another train from Ormskirk to Liverpool. Why have two trains? What if one train breaks down or fails to even turn up?

I'm sure I read once that the Ormskirk services get cancelled frequently as well.
And delays from Preston would impact on Liverpool. Additionally, what sort of train would be capable of working through? (We are talking a few years ago, pre bi mode ideas).
 

Legolash2o

Member
Joined
27 Sep 2018
Messages
687
In that case you could reconnect the lines but keep the services running the same way that they are. The only difference would be that freight trains will be able to go through (probably worth double-tracking).
 

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,900
In that case you could reconnect the lines but keep the services running the same way that they are. The only difference would be that freight trains will be able to go through (probably worth double-tracking).
And have freights impacting on the electrics? I don't think so.

By the way, I am very pro freight, I am simply talking from a Merseyside perspective.
 

Legolash2o

Member
Joined
27 Sep 2018
Messages
687
Maybe. Double-tracking would improve things but also adding a few loops or even four-tracking some areas.

Sure, passenger trains are important but so are the jobs that come with growth and opportunities. My main concern is that 60%+ of containers, according to statistics and some say even higher, are high-cube. My maps/data show that the busiest freight movements are on routes that are at least W10. I just don't want the Transpennine to miss out!

At the end of the day that line can be kept at passenger priority.
 

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,900
My main concern is that 60%+ of containers, according to statistics and some say even higher, are high-cube. My maps/data show that the busiest freight movements are on routes that are at least W10. I just don't want the Transpennine to miss out!
Agreed. The main reason the Widnes to Teesport service for P&O Ferrymasters failed was the convoluted route it had to take to find a suitable loading gauge.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,939
Location
Airedale
Would it be simpler to go via Edge Hill - Wigan NW - Lostock Hall? I know there would be pathing issues on the WCML, but the various sections of quadruple track (including at Huyton) would be an asset.
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,195
I've been looking into options for a W10/W12 gauge cleared route through the Transpennines (Calder).

The route I'm thinking is from Doncaster -> Wakefield -> Mirfield -> Sowerby Bridge -> Lostock Hall Junction.

A new junction would have to be created between Lostock Hall and line to Ormskirk. Both tracks at Ormskirk would have to be re-connected and finally an old tunnel near Bootle Jn would have to be re-instated.

Does anyone see any issues with this idea? It's option Preston 2 on the link below.
https://railmap.azurewebsites.net/Public/Upgrade (7am to 9pm only)

Thanks.
View attachment 58527

Just to be clear what you're suggesting ...

From Blackburn it would be a curve (which used to exist) at Lostock Hall to reach Ormskirk then branch off at Aintree? This takes you to Bootle Junction, but where exactly are you trying to reach?
 

Legolash2o

Member
Joined
27 Sep 2018
Messages
687
Would it be simpler to go via Edge Hill - Wigan NW - Lostock Hall? I know there would be pathing issues on the WCML, but the various sections of quadruple track (including at Huyton) would be an asset.

I'll have a look but I was trying to avoid heavily used passenger stations and the WCML.

Just to be clear what you're suggesting ...

From Blackburn it would be a curve (which used to exist) at Lostock Hall to reach Ormskirk then branch off at Aintree? This takes you to Bootle Junction, but where exactly are you trying to reach?
Not Aintree, but some tunnels at Kirkdale. Trying to reach the port.
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,195
I'll have a look but I was trying to avoid heavily used passenger stations and the WCML.


Not Aintree, but some tunnels at Kirkdale. Trying to reach the port.

Trouble with going as far as Kirkdale is that you then have to fit it across both Ormskirk and Kirkby services. Plus I can't visualise how you get from Kirkdale to the Docks.
 

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,322
Trouble with going as far as Kirkdale is that you then have to fit it across both Ormskirk and Kirkby services. Plus I can't visualise how you get from Kirkdale to the Docks.
You can't get easily from Kirkdale to the docks. You would need to build a new, rather steep connection down to the line from Edge Hill to Bootle (LBT)/Seaforth, which passes beneath the sidings at Kirkdale Depot..
 

Legolash2o

Member
Joined
27 Sep 2018
Messages
687
What market is this new route trying to satisfy?
East-West freight movements (high-cube).

Trouble with going as far as Kirkdale is that you then have to fit it across both Ormskirk and Kirkby services. Plus I can't visualise how you get from Kirkdale to the Docks.
You can't get easily from Kirkdale to the docks. You would need to build a new, rather steep connection down to the line from Edge Hill to Bootle (LBT)/Seaforth, which passes beneath the sidings at Kirkdale Depot..

There looks to be some old tunnels near Kirkdale that can be used.
Is it providing feedback - or asking for feedback? Title not clear really...

Asking for feedback.
 