397003 is currently working 3E99 0938 Longsight T.M.D. (D) to Doncaster Works Wagon Shops, lead to believe that this is for overhaul.

Also believe this is the first 397 to work south of Edinburgh and into ECML?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
Also believe this is the first 397 to work south of Edinburgh and into ECML?
It is.

Assuming this run goes without issue, one would guess it may open the door to 397s covering Edinburgh - Berwick/Newcastle stoppers during disruption or if there’s ever a shortage of 802s, some crews already sign both the route and the stock.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
397003 is currently working 3E99 0938 Longsight T.M.D. (D) to Doncaster Works Wagon Shops, lead to believe that this is for overhaul.
Also believe this is the first 397 to work south of Edinburgh and into ECML?
That's a 500 mile grand tour (initially via Crewe) to cover the 60 mile TPE South route.
Going via the North London line is about 350 miles.
No doubt the present route avoids clearance and route knowledge issues, benefitting from the established movements to/from Hitachi sites.
It's hard to put a date when a fully-wired route cross-Pennine would be available for such moves, presumably after 2030 when TRU delivers.
Even then it will be necessary to reverse at Leeds or York.

The RTT entry says "planned for 125mph max".
Is this an opportunity to test a 397 at that speed on the ECML?
Both CAF and LNER have an interest in how this stock performs at that speed.
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,557
It is.

Assuming this run goes without issue, one would guess it may open the door to 397s covering Edinburgh - Berwick/Newcastle stoppers during disruption or if there’s ever a shortage of 802s, some crews already sign both the route and the stock.

Never say never but given the tight availability for 397 west coast diagrams (9-10 set daily requirement) this would be very unlikely.
 

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
10,544
I keep reading about this job of work being done to these units, do we know exactly what the scope is that Doncaster are supposedly carrying out
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,557
The RTT entry says "planned for 125mph max".
Is this an opportunity to test a 397 at that speed on the ECML?
Both CAF and LNER have an interest in how this stock performs at that speed.

397s are always timed at 125mph on RTT. From Edinburgh it's pathed as a 22x.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
The RTT entry says "planned for 125mph max".
Is this an opportunity to test a 397 at that speed on the ECML?
Both CAF and LNER have an interest in how this stock performs at that speed.
They’ve already been tested at 125mph. They’re 125mph units, only reason they don’t run at 125mph in service is because there aren’t any non-EPS 125mph limits where the 397s operate.

Never say never but given the tight availability for 397 west coast diagrams (9-10 set daily requirement) this would be very unlikely.
Oh I’m well aware it’s unlikely to ever be booked work for them. But during disruption possibly, for example if the WCML were blocked north of Carlisle and there were a few units ‘trapped’ north of the border.

== Doublepost prevention - post automatically merged: ==

Noticed that this working appears to be stopping at Chathill, Acklington, Widdrington, Pegswood, Cramlington, Manors and Chester-le-Street. These stations all have one thing in common - none of them have platforms long enough for a 397. Are they testing SDO on this move? Or are the stops at those stations for another reason?

Update 19:05
Just seen it at Chester-le-Street. Staff got out and measured the step between the train and the platform. Any idea why this is being done, considering the chances of a 397 ever stopping at Chester-le-Street in passenger service are practically nil?
 
Last edited:

800001

Established Member
Joined
24 Oct 2015
Messages
7,308
They’ve already been tested at 125mph. They’re 125mph units, only reason they don’t run at 125mph in service is because there aren’t any non-EPS 125mph limits where the 397s operate.


Oh I’m well aware it’s unlikely to ever be booked work for them. But during disruption possibly, for example if the WCML were blocked north of Carlisle and there were a few units ‘trapped’ north of the border.

== Doublepost prevention - post automatically merged: ==

Noticed that this working appears to be stopping at Chathill, Acklington, Widdrington, Pegswood, Cramlington, Manors and Chester-le-Street. These stations all have one thing in common - none of them have platforms long enough for a 397. Are they testing SDO on this move? Or are the stops at those stations for another reason?

Update 19:05
Just seen it at Chester-le-Street. Staff got out and measured the step between the train and the platform. Any idea why this is being done, considering the chances of a 397 ever stopping at Chester-le-Street in passenger service are practically nil?
From a Facebook post ‘platform height and gauging measurements’ were taken.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
From a Facebook post ‘platform height and gauging measurements’ were taken.
I saw them take the measurements at Chester-le-Street. Can’t for the life of me think of why they’d want the measurements for these stations specifically though, and not stations like Durham.
 

danbarjon

Member
Joined
6 Feb 2022
Messages
327
Location
West Lancashire
I saw them take the measurements at Chester-le-Street. Can’t for the life of me think of why they’d want the measurements for these stations specifically though, and not stations like Durham.
Maybe they are looking at feasibility for more 397s (bi-mode obviously) as part of the tender they've got...
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham

danbarjon

Member
Joined
6 Feb 2022
Messages
327
Location
West Lancashire
If the measurements were for LNER then why were they only taken at stations that LNER don’t call at? Just doesn’t make sense, there surely has to be another reason for it that’s unrelated to the 897 order.
There is an Edinburgh to York train now and again so maybe they were testing for that
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,902
Location
Mold, Clwyd
I was hoping they would order more middle cars to make the 397s 7 cars or something, or 6 at least
5 cars are surely gonna burst on the north WCML at some point...
The original contract with CAF did include options for more/longer 397s, but those will have expired.
That was before the various pauses in the TRU electrification schedule.
 

SamCam

Member
Joined
7 Mar 2024
Messages
37
Location
Edinburgh
I was hoping they would order more middle cars to make the 397s 7 cars or something, or 6 at least
5 cars are surely gonna burst on the north WCML at some point...
I agree - travelling between Scotland and the likes of Lancaster/Carlisle, the difference in overcrowding between a 5-car 397 and an 11-car Pendolino makes the latter a much more attractive option...
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,091
Location
"Marston Vale mafia"
I agree - travelling between Scotland and the likes of Lancaster/Carlisle, the difference in overcrowding between a 5-car 397 and an 11-car Pendolino makes the latter a much more attractive option...

They apply fake compulsory reservations to these - but "sold out" is very commonly shown, whereas it's rare on Pendolinos. I think the success of Manchester-Scotland was rather underestimated when specifying capacity - this route is easily as busy as a Euston one.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,308
Wouldn’t the issue then become, how are these platformed at Manchester Airport if they are made longer?
How does the platforming of these currently work at Airport? Do they share with other services? Or use platform on their own?
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,557
Wouldn’t the issue then become, how are these platformed at Manchester Airport if they are made longer?
How does the platforming of these currently work at Airport? Do they share with other services? Or use platform on their own?

As originally built the 397 had an option to be extended up to 8 coaches in length.

Manchester Airport platforms can hold 8 coaches but if a train longer than 4 vehicles is in the platform permissive working can't be used. Essentially a 397 (or 802) must use an empty platform and can't have another short unit put on top.
 

Lg_

Member
Joined
29 Jun 2023
Messages
44
Location
Lancashire
As originally built the 397 had an option to be extended up to 8 coaches in length.

Manchester Airport platforms can hold 8 coaches but if a train longer than 4 vehicles is in the platform permissive working can't be used. Essentially a 397 (or 802) must use an empty platform and can't have another short unit put on top.
Generally speaking 397's and 802's don't share platforms at the airport anyway, you could fit a 7 car 802 or an 8 car 397 in the airport.

The only other place I'd anticipate an issue on the WCML would be Haymarket which only fits 7 carriages of a Pendo in.
 

SamCam

Member
Joined
7 Mar 2024
Messages
37
Location
Edinburgh
The only other place I'd anticipate an issue on the WCML would be Haymarket which only fits 7 carriages of a Pendo in.
Haymarket fits 8 carriages of a 385 or 9 carriages of an Azuma in no problem, so one or two extra vehicles added to a 397 shouldn't be a problem?
 

Scotrail314209

Established Member
Joined
1 Feb 2017
Messages
2,475
Location
Edinburgh
I think it would be nice having them as a 7 car. One thing they’d need for sure is some more First Class, even if it’s just half a carriage worth (like Coach K on the Azuma fleet which is Half standard, half first). Pair that with an extra Standard class coach and it’d be perfect.

First Class on the Manchester to Scotland services (particularly from Edinburgh) has been going out pretty full recently, which I’m pretty sure has been spurred on by the launch of West Coast Kitchen.
 

Bungle965

Established Member
Associate Staff
Buses & Coaches
Joined
2 Jul 2014
Messages
3,375
Location
Calder Valley
First Class on the Manchester to Scotland services (particularly from Edinburgh) has been going out pretty full recently, which I’m pretty sure has been spurred on by the launch of West Coast Kitchen.
Which then actually surely devalues the First Class proposition! No one wants to be in 1st class and have about as much room as in Standard.
 

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,321
As originally built the 397 had an option to be extended up to 8 coaches in length.

Manchester Airport platforms can hold 8 coaches but if a train longer than 4 vehicles is in the platform permissive working can't be used. Essentially a 397 (or 802) must use an empty platform and can't have another short unit put on top.
As many of the Manchester / Edinburgh services used to be pairs of 350s, I don't see 6 or 7 coach 397s being much of a problem.
 

InOban

On Moderation
Joined
12 Mar 2017
Messages
4,537
Indeed. I would say it's pretty good to be able to get to this stage in just six weeks.

Generally speaking 397's and 802's don't share platforms at the airport anyway, you could fit a 7 car 802 or an 8 car 397 in the airport.

The only other place I'd anticipate an issue on the WCML would be Haymarket which only fits 7 carriages of a Pendo in.
The relevant platforms at Haymarket are 230m which should accommodate 9 vehicles of a Pendo. Platform 1 is shorter which affects the southbound Azumas.
 