After the delivery of the new Thameslink rolling stock, could a fleet of cascaded class 319 EMUs become dedicated for the TransManche Metro between Kent and Nord-pas-de-Calais?
I understand that the ceremonial workings through the Channel Tunnel after competition with 319008/009 in 1993 were modified with extended pantographs to meet the Eurotunnel catenary height and also worked under possession due to not being equipped with TVM430.
Pros;
- dual voltage between former SR 750V DC third rail and 25kv AC overhead catenary, so can operate on classic lines in GB and thus not confined to HS1. In regards to the pantograph height differential as per the ceremonial 319s - if the trains would operate predominately in Kent only with the 25kv AC option being used excelusively for the Channel Tunnel and France, the pantograph could be fixed to ET cantery height with no regard to the GB height, I don't know how this would compare with French catenary height.
- retention toilets, so they won't crap all over the Tunnel.
- frontal cab evacuation doors.
Cons;
- no TVM430 or KVB.
- no fire doors, however they could probably be retrofitted by the removal of the existing the hinged doors with sliding doors, as per the Railcare 317/7 refurbishment for the Stansted Express (http://www.railfaneurope.net/pix/gb/electric/emu-ac/317/WAGN/317_WAGN_Stansted_Express5.jpg).
- platform height differential between GB/F/ET standards.
- no pressure sealing, 319s have hopper windows - so there would possibly be some clashes with atmospherics when inside the CT.
All of these technicalities can also be applied to the 375/377 fleet if they were ever to be proposed for use, too.
I understand that the ceremonial workings through the Channel Tunnel after competition with 319008/009 in 1993 were modified with extended pantographs to meet the Eurotunnel catenary height and also worked under possession due to not being equipped with TVM430.
Pros;
- dual voltage between former SR 750V DC third rail and 25kv AC overhead catenary, so can operate on classic lines in GB and thus not confined to HS1. In regards to the pantograph height differential as per the ceremonial 319s - if the trains would operate predominately in Kent only with the 25kv AC option being used excelusively for the Channel Tunnel and France, the pantograph could be fixed to ET cantery height with no regard to the GB height, I don't know how this would compare with French catenary height.
- retention toilets, so they won't crap all over the Tunnel.
- frontal cab evacuation doors.
Cons;
- no TVM430 or KVB.
- no fire doors, however they could probably be retrofitted by the removal of the existing the hinged doors with sliding doors, as per the Railcare 317/7 refurbishment for the Stansted Express (http://www.railfaneurope.net/pix/gb/electric/emu-ac/317/WAGN/317_WAGN_Stansted_Express5.jpg).
- platform height differential between GB/F/ET standards.
- no pressure sealing, 319s have hopper windows - so there would possibly be some clashes with atmospherics when inside the CT.
All of these technicalities can also be applied to the 375/377 fleet if they were ever to be proposed for use, too.