j0hn0
Member
This is a most valid point and surely would come into consideration during the period of evaluation.
Like I said, see Nice trams as to what is capable on a battery
This is a most valid point and surely would come into consideration during the period of evaluation.
Tram-Train is essentially an already tried and tested mode of operating though.
Typically it is known as the Karlsruhe model because the city of Karlsruhe developed the modern version of it. But it is in use, and works, here in the UK, and it is a nonsense to suggest otherwise. Tyne and Wear Metro cars are built to light rail standards, although they are not built to be compatible with the road network. The Sunderland Direct extension runs on heavily-used network rail track from Pelaw Junction to Sunderland (although in fact the entire line to South Hylton is actually owned by NR). The two main issues that required accommodating, other than the OHLE, is that the signalling uses both TPWS and the german PZB system for train-stop functions, and there is a mandatory three-minute separation between light rail and heavy rail vehicles enforced by the signalling system. But the model works here and is not untested. What may be untested is the use of Light Rail Vehicles with diesel engines or battery/capacitor power.
I would barely say Pelaw Jn - Sunderland is heavily used by Network Rail services, it is used by an hourly Northern service in each direction and 4 GC's each way a day. It used to have 2 Northern services per hour but as punctuality figures were struggling on the line it was reduced to one, so hardly a major success of sharing if we are being honest.
This is not a dig at my hometown Tyne and Wear Metro as I think it is a good system including the Sunderland extension but to suggest the sharing has worked completely is inaccurate
On that route, between Horsforth and Weeton, lies Bramhope Tunnel, which has a length of 2 miles 241 yards. The question that I raise is...has there ever been tram-train operation anywhere through a tunnel of this length? This is without raising the matter of the seepage in the tunnel and other water-related problems.
Although most of the long tunnels on the TW Metro were contructed in the 70s/80s, some of the ones between North Shields and Tynemouth have been there for over 100 years.
In short, yes there will be problems with water seeping but this can be overcome.
Leeds - Harrogate - York doesn't need tram-train, what benefit would it bring to be able to run the units on tram lines, when it run between two cities that don't have any?
The hourly Newcastle - Sunderland service was not dropped due to punctuality, but mainly due to the fact that Nexus could serve Brockley Whins, East Boldon and Seaburn better and more frequently with the Metro than a traditional heavy rail service. This also had the added benefit of saving Nexus the subsidy that was given to Northern for running the local stoppers, which enabled Nexus to apply to the DfT for funding for the redevelopment of Sunderland station (as the money would be recouped anyway within a few years). I'd agree that Pelaw Jct is not that well used, yet after Brockley Whins I'd say it is very well used, especially with the new Boldon East Chord allowing trains from Tyne Dock to go south straight along the Durham Coast line.
I--- old post above --- --- new post below ---
.
Incorrect as the Northern Rail half hourly express Middlesborough service (calling only at the Heworth Rail station) ran until December 2005 timetable and the Tyne and Wear Metro extension opened in 2002. Prior to Metro it was quarter hourly (2 stoppers and 2 Middlesborugh semi fasts) with a occasional TPE. It was the same timetable change which saw half the South Hylton services chopped back which was reinstated recently
Leeds - Harrogate - York doesn't need tram-train, what benefit would it bring to be able to run the units on tram lines, when it run between two cities that don't have any?
If you ahve the timetables I'd very much like to see them. From memory there were only two services per hour from Newcastle to Sunderland - the one to the Boro and the other which called at each station between Newcastle and Sunderland. When the Sunderland extension opened the stopping service between Newcastle and Sunderland was removed.
--- old post above --- --- new post below ---
Was designed to run in as a link to Leeds-Bradford International Airport on one end and York city centre and York Hospital on the other end. Since it was shelved a few years back nearly every document online about it has magically disappeared.
Ok I'll let you find them, then I'll await you telling me I was correct. Ive produced documents stating it was 4 an hour but yet you still dont believe me. Ah well.
It is not that I don't believe you, more that I can't remember what the workings used to be. However I don't see where your original point comes from - that one of the Northern services was dropped due to punctuality.
I have to say though that Im incredibly surprised that the service used to be half hourly between Middlesbrough and Sunderland: I could have sworn that it has only ever been hourly in my lifetime. I can certainly remember some Hartlepool terminators though, I assume these were the stoppers.
Anvil1984 said:Read the other bit i forgot to highlight
4tph between Chester and Manchester and up the East Lancs
limited stop from Alt'ham to Manchester
Opinions?
One opinion; if this is to run alongside the current ten trams per hour from Altricham to central Manchester then running "limited stop" is just going to mean sitting behind the tram in front for 95% of that journey (with no scope to overtake)
And, seriously, four "four coach" services an hour (to replace the hourly Pacer/ Sprinter on the Cheshire line)?
so they could run Rawthenstall - Chester / Crewe.
Chester - Manchester is about 1hr 30 via the Mid Cheshire and metrolink into Piccadilly...
Would re-opening the line through Middlewitch and running 2ttph to Crewe or Sandbatch that way be out of the question?
Would need to do somthing about intergrated local ticketing though, and have a 150/153 shuttle run between Stockport and Alt'ham
the Altrincham-Knutsford section could do with extra capacity both peak and off-peak
Like a lot of lines in "the north" which are stuck with an hourly Pacer service.
However, increasing that to four services an hour seems quite a jump.
Vossloh to supply Rotherham tram-trains
UK: Vossloh has been selected as 'lead bidder' for the supply of rolling stock for the Sheffield - Rotherham tram-train pilot project, Transport Minister Norman Baker told the All Party Parliamentary Light Rail Group event on July 12.
The business case is still being developed to ensure best value for money, but the Department for Transport is supportive and train operator Northern Rail, which is procuring the vehicles on behalf of DfT, anticipates that services will begin in 2014.
The project includes a connection between Sheffield's Supertram network and a Network Rail freight line which will be electrified at 750 V DC. There will be an initial 20 min headway service to Parkgate in Rotherham, where the tram stop will be integrated with a brown field development.
Interspersing freight and tram-train services is seen as an essential part of the pilot scheme, which Baker said provides 'a good microcosm of what is needed' for tram-train operation in the UK.
However Robert Whyte, Commercial Manager at Alstom Transport, pointed out to APPLRG that tram-train is already established in France and Germany, and the UK is 'still quite a long way behind our continental cousins' and 'seems to be forever trying to reinvent the wheel'.
http://www.railwaygazette.com/news/.../vossloh-to-supply-rotherham-tram-trains.html