pdq
Member
- Joined
- 7 Oct 2010
- Messages
- 894
Just been delayed by 30 mins due to a broken down train ahead of us in the Standedge Tunnel. Looks like it was this one: http://www.realtimetrains.co.uk/train/Y41742/2014/04/28/advanced
It was on time up to the tunnel, so what's likely to have gone so wrong?
It was on time up to the tunnel, so what's likely to have gone so wrong?