I travelled from Kent into London on Sunday and there was a significant amount of engineering work taking place. Not unusual for a Bank Holiday weekend but it did get me wondering what impact the high temperatures have on the blockades.
It was 30 degrees that day and the track workers were still dressed head to toe in PPE during the middle of the day. They were working on the lines into London Bridge which are completely exposed to the sun. I have nothing but respect for those who were working.
Do the workers take extra breaks away from the sun? Is it common for blockades to be delayed because of the impact of hot weather and everything taking a bit longer? Can any concessions be made around PPE and clothing?
It was 30 degrees that day and the track workers were still dressed head to toe in PPE during the middle of the day. They were working on the lines into London Bridge which are completely exposed to the sun. I have nothing but respect for those who were working.
Do the workers take extra breaks away from the sun? Is it common for blockades to be delayed because of the impact of hot weather and everything taking a bit longer? Can any concessions be made around PPE and clothing?