• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Track/Signalling Failures

Status
Not open for further replies.

Brush 4

Member
Joined
25 Nov 2018
Messages
715
Are there any reference websites or publications that record instances of signalling problems/track circuit/point failures available anywhere? They seem more prevalent now than they were but, that may be a false impression but, only official stats going back at least to the 70's or 60's can prove or disprove this.

Also, how many signalling failures are there nowadays on those lines still under semaphores? It seems as if it is the latest digital systems that fail the most but again, only the official stats will settle that one.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,562
Location
UK
It's the rise of social media, higher reporting standards, and transparency that gives that impression. The slightest delay on the trains and it starts a tweetstorm. Not only are you updated in realtime; you can check the entire days service at the click of an app.
 

Stampy

Member
Joined
21 Sep 2014
Messages
417
Location
Peterborough
Speaking of track circuit failures...

I remember watching a YouTube video a year or so back on TC failures on the Southern region (they had either VC/VS plates on the signals) and showed 2 "failures" - one was a signal "flipping" between all aspects, can't remember the other fault - nor can I find the said video??
 

pompeyfan

Established Member
Joined
24 Jan 2012
Messages
4,445
Semaphores have their own issues, 1 particular signal at Yeovil PM has ongoing issues with it, usually not replacing to the ON position after it’s been passed.
 

coppercapped

Established Member
Joined
13 Sep 2015
Messages
3,319
Location
Reading
An article in the current (January 2019) edition of Modern Railways (Leading Article, page 3) claims that the number of rail breaks per year are now only 10% of the annual rate seen just before the Hatfield crash in 2000.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
32,892
Location
Fenny Stratford
An article in the current (January 2019) edition of Modern Railways (Leading Article, page 3) claims that the number of rail breaks per year are now only 10% of the annual rate seen just before the Hatfield crash in 2000.

In part becuase ot much better grinding and milling of the rail as part of a preventative programme
 

LAX54

Established Member
Joined
15 Jan 2008
Messages
3,906
A very quick search brings up stats for CP4.

https://dataportal.orr.gov.uk/displayreport/report/html/db7634db-1359-4fe6-9815-b92fca9c7648

Shows, on the whole, failures dropping. Points failures halved in a control period.

The office of rail and road will be your best bet for publicly available stats.

Remote monitoring by fault control, can give the early warning of a looming points failure, (if fitted with the required gizmo), so S&T can get there and fix before they fail :)
 

Belperpete

Established Member
Joined
17 Aug 2018
Messages
3,596
Are there any reference websites or publications that record instances of signalling problems/track circuit/point failures available anywhere? They seem more prevalent now than they were but, that may be a false impression but, only official stats going back at least to the 70's or 60's can prove or disprove this.
I doubt that stats were kept in the same kind of way back in the 60s or 70s - there was no need to. It is only since privatisation and current performance regimes that stats have become so important.
 
Status
Not open for further replies.

Top