• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

TPWS at Permanent Speed Restrictions

Status
Not open for further replies.

DerekC

Established Member
Joined
26 Oct 2015
Messages
2,439
Location
Hampshire (nearly a Hog)
According to Railway Group Standards (GE/RT 8075 Issue 2)

TPWS shall be provided on the approach to speed restrictions where the permitted speed on the approach is 60 mph or more and the speed restriction reduces the speed by at least one-third except for: a) Temporary speed restrictions in place for three months or less. And b) Temporary speed restrictions in place for between three months and twelve months, subject to risk assessment,

There are a considerable number of other exceptions.

My question is - does anybody know roughly how many TPWS OSS loops are fitted at PSRs? Any examples of where they are fitted would be helpful.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

rd749249

Member
Joined
15 Sep 2015
Messages
187
According to Railway Group Standards (GE/RT 8075 Issue 2)



There are a considerable number of other exceptions.

My question is - does anybody know roughly how many TPWS OSS loops are fitted at PSRs? Any examples of where they are fitted would be helpful.

Just thinking of my line of route. For example, the down electric has PSR/TPWS OSS at:

- Bow Junction / Carpenters Rd South Jct
- Manor Park / Ilford flyover
- Gidea Park London end
- Shenfield London end

So my guess is that they're quite common.
 

HarleyDavidson

Established Member
Joined
23 Aug 2014
Messages
2,544
The one's that I know of and the speeds that they protect (but not trigger speed) in brackets.

London Rd (Guildford) (40)
A3 bridge on the Reading line (40)
Site of Ash Junction (40)
Wooden bridge A3 (50)
Chalk Tunnel (25)
Woking Junction (40)
Havant Junction (40)
Havant West (40)
Wimbledon Up Slow (30)
Epsom (20)
Farnham (Weybourne) (30)
Frimley Junction (40)
Farnborough Down Slow (65)
St Denys (Mount Pleasant) (20)

These exclude TPWS + and - derivatives.
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,705
I would have thought the list would be massive! they aren't a rare piece of kit.
 

bengley

Established Member
Joined
18 May 2008
Messages
1,987
Indeed, they are not rare. Speed changes which meet the quoted requirement in the OP will almost all have TPWS OSS.
 

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,564
... unless they're planned to be in place for more than six months.

We've had TSRs in place for years without TPWS and even those planned for longer haven't had it fitted. I've certainly never heard of TPWS fitted to TSRs and never heard it mentioned.

My concern for TPWS at a TSR would be the ability of those setting it up to do it correctly. They struggle putting the normal equipment out in the proper places sometimes.
 
Last edited:

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
We've had TSRs in place for years without TPWS and even those planned for longer haven't had it fitted. I've certainly never heard of TPWS fitted to TSRs and never heard it mentioned.

It's possible that, as with some PSRs, they didn't meet the criteria for TPWS fitment.

I certainly have heard of TPWS being fitted to TSRs. I occasionally see TPWS fitment mentioned within Section A of the Weekly Operating Notice. It's uncommon but it does happen.
 

DerekC

Established Member
Joined
26 Oct 2015
Messages
2,439
Location
Hampshire (nearly a Hog)
Thanks very much for the info on the SW and GE areas. Can anybody help with some info from WCML, ECML, GWML or Scotland? It doesn't have to be comprehensive - just enough to give some idea of TPWS coverage of PSRs.
 

Railsigns

Established Member
Joined
15 Feb 2010
Messages
2,754
According to the document linked here, there are around 1150 PSRs fitted with TPWS (and about 50 TSRs).
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,705
Though if following the process, a TSR that has been on for 6 months should be made into a PSR unless there is a dated plan to fix it.
 

LowLevel

Established Member
Joined
26 Oct 2013
Messages
8,920
Firsby Curve between Boston and Wainfleet is fitted - that's 60mph down to 25.
 
Status
Not open for further replies.

Top