sufian123
Member
Yes, but why?
It’s to get the sets in glc ready for services to Euston. Glasgow line is closed previous night 26. So on Monday morning they get sets back to glc. Rather doing ecs in the morning, bank holiday so services times differ
Yes, but why?
I initially thought that the line would have been closed between Birmingham and Crewe/Warrington Bank Quay, as the timings from Wigan North Western and Preston northwards are the times normally from/via Birmingham.
Also, would First Class be at the buffer end upon arrival at Glasgow Central, or will it be arranged beforehand to have it at the London end of the train as normal?
Liverpool to Glasgow services have now been amended in the data uploadlly it is worthy of note that 2012 Liverpool Lime Street to Oxenholme Lake District, which had been due to call at St Helens Central, Wigan North Western, Preston and Lancaster has not been withdrawn. This implies this is a part of a diagram which will continue to run even if the Glasgow services cannot. But then who knows. They are currently selling that train though.
It would only be Springs Branch to Huyton they'd need to learn though, wouldn't it? Alternatively, TPE could run it via Newton, and stay on lines that their crews sign already.Don't think that will run as it stands, would imagine it will commence with all the Liverpool services.
No TPE train crew sign Wigan NW to Liverpool as it stands so for it to happen route learning would need to rapidly start, you never know but it would be cutting it fine.
It would only be Springs Branch to Huyton they'd need to learn though, wouldn't it? Alternatively, TPE could run it via Newton, and stay on lines that their crews sign already.
For anyone interested in a passenger Liv-Glasgow:
http://www.realtimetrains.co.uk/train/S51712/2019/05/27/advanced
http://www.realtimetrains.co.uk/train/S51713/2019/05/27/advanced
http://www.realtimetrains.co.uk/train/S51716/2019/05/27/advanced
Liverpool TPE crews will not be signing the traction (350/397s) that will operate the new services. Whilst it will initially be operated with 185s (reportedly), long term the 397s will work it. Only Preston TPE crews will sign the route, and they need the entire route from Lowton Jn & Springs Branch Jn to Liverpool.
I'm trying to get my head around why its put in the schedule as it is, there is no need for it to be spread as the train is never going to keep to that. It has 1T51 and 1C52 in the other train ahead of it at Golborne which it is following but its still an awful schedule.Via Golborne.
Don't expect fireworks, two of these have 25 minutes of pathing time before Wigan!
I'm trying to get my head around why its put in the schedule as it is, there is no need for it to be spread as the train is never going to keep to that. It has 1T51 and 1C52 in the other train ahead of it at Golborne which it is following but its still an awful schedule.
I've just looked at that, it could stop at every station and keep to time! Is it not accidently been timed for a 142!?? 27m to St Helens Jn is terrible.....
20:24 Lime St to Newcastle
Is this now not running to Edinburgh from May 2019?
I believe they are all extended from December but this one service was due to extend from May however it’s disappeared from RTT
RTT shows the calls at Bolton not starting until Monday 29 July.First Bolton call should have occured last Friday (unable to quote from locked thread)
https://www.railforums.co.uk/thread...r-electrification.66879/page-332#post-4011090
But was recorded as not stopping.
http://www.realtimetrains.co.uk/train/Y00636/2019/07/05/advanced
That service was a STP path for 5/7 only, quite clearly displaying a pick-up only call at BoltonRTT shows the calls at Bolton not starting until Monday 29 July.
Sorry, I should have followed the link in your old post that you linked in your previous post!That service was a STP path for 5/7 only, quite clearly displaying a pick-up only call at Bolton
Blackpool - Manchester Electrification #9951td97 said:...à la 1S92 21:05 Manchester International Airport to Glasgow Central High Level
(Although this was added before the ESR removal)
Do you know the reason that one-off call at Bolton was scheduled?
Sorry, I should have followed the link in your old post that you linked in your previous post!
BTW, you can quote from a locked thread by doing a copy and paste then adding QUOTE tags, thus:
Blackpool - Manchester Electrification #9951
Do you know the reason that one-off call at Bolton was scheduled?