TPE this afternoon.

Status
Not open for further replies.

Mugby

Established Member
Joined
25 Nov 2012
Messages
2,130
Location
Derby
Were TPE having some problems this afternoon?

I was at Preston station and the 14.12 from Edinburgh, due Preston at 16.45 was shown as best part of an hour late, the following one, the 15.06 from Glasgow, due Preston at 17.46 was shown as cancelled.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

harz99

Member
Joined
14 Jul 2009
Messages
913
lol So soon!
--- old post above --- --- new post below ---


That would have no effect on a train coming from Scotland

Northbound failure; southbound delay/cancellation................from either no stock or no crew...............
 

TOCDriver

Member
Joined
24 Jan 2013
Messages
609
Northbound failure; southbound delay/cancellation................from either no stock or no crew...............

Wouldn't have any effect for crews coming from Scotland. Onwards South from Preston, yes.
 

northwichcat

Veteran Member
Joined
23 Jan 2009
Messages
32,692
Location
Northwich
TPE are 2 x 350/4 down currently. A 6 car 185 diagram has been de-strengthened to plug the gap while a 8 car 350 diagram is being run with 4 carriages.
 
Last edited by a moderator:

CallySleeper

Established Member
Joined
27 Jun 2006
Messages
1,662
Location
trentbartonland
That would have no effect on a train coming from Scotland

Actually, it appears that the failed train ran to Edinburgh and back, returning around 50 mins late and capped at Manchester. The other TPE which was cancelled was possibly due to the fact it was following it. Why make such a presumptuous statement?
 

Mugby

Established Member
Joined
25 Nov 2012
Messages
2,130
Location
Derby
The ones which I saw yesterday were very well loaded so a cancelled train must have caused a hell of a crush on the others.

But how would the cancelled unit have been worked back?
 

Dunc108

Member
Joined
10 Jun 2013
Messages
270
Location
Morecambe
Well it seems even the new TPE Scottish electrics are off to a very mixed start to say the least!
 

scotsman

Established Member
Joined
6 Jul 2010
Messages
3,252
1000 Manchester Airport - Edinburgh developed a pantograph fault, delaying it considerably, leading to the 1416 Edinburgh - Manchester Airport to be delayed by around 40 minutes and subsequently terminated at Manchester Piccadilly.
 

harz99

Member
Joined
14 Jul 2009
Messages
913
1000 Manchester Airport - Edinburgh developed a pantograph fault, delaying it considerably, leading to the 1416 Edinburgh - Manchester Airport to be delayed by around 40 minutes and subsequently terminated at Manchester Piccadilly.

Was that unit 405?
 