Tondu-Margam Line (South Wales) - 2026 Update

Status
Not open for further replies.

swtfw

New Member
Joined
28 Apr 2026
Messages
1
Location
Pontyclun
2026 update for the Tondu-Margam line in Bridgend, South Wales. I have received this information via a FOI request to Network Rail, sharing for anyone interested in the future of this line.

'The Tondu- Margam branch line is not currently under a T3 possession. The line is operating under a Section C arrangement, where the line is closed by restricting the signaller’s authority to direct trains on to it. The difference between the two is that a possession is a short term closure for engineering work, whereas a Section C is a longer term arrangement providing a reversible closure of the route. Historically, the line was subject to a T3 possession for a number of years, during which it was closed to normal traffic. However, in 2024, the arrangements were revised. This change was made due to the operational and safety complexities associated with maintaining an active line possession.'

'The line was subject to a T3 possession on 22 June 2018. The line was then put under a section C on the 13 September 2024.'

'Mothballing3 is proposed via a Short Term Network Change for the immediate future. This proposal has not been formalised or agreed with Train Operating Companies (TOC) or Freight Operating Companies (FOC). However, it includes a commitment by us to reopen
the line within 12 months should a request be received from a TOC or FOC to operate regular services. The line is considered to be of strategic importance and is therefore unlikely to be permanently closed as it provides the only diversionary route for the SWM2 between Margam and Bridgend. Due to current capacity restraints, it is not suitable for use as a routine diversionary route to support engineering works on the main line. Its use would generally be limited to key services during major engineering work unless signalling
enhancements are delivered. The line is included within the Tondu resignalling scheme, which is currently proposed as a Control Period 8 (2029-2034)/ Funding Period 1 (CP8/FP1) item. Reopening of the line may form part of this resignalling programme if capacity is increased and if there is demand for services from Transport for Wales (TfW) or FOCs.'
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,858
Location
West of Andover
The chance of that freight line seeing use again is probably as high as the freight line between Ystrad Mynach & Cwmbargoed or between Pantyffynnon & Gwaun-cae-Gurwen.

The single track between Bridgend & Tondu doesn't help, as well as any trains requiring to use the line needing to reverse in the Tondu area. The only thing which might see the line coming back to life if anything major should happen to close the main-line between Bridgend & Margam on a long term basis.
 

jayah

On Moderation
Joined
18 Apr 2011
Messages
2,057
2026 update for the Tondu-Margam line in Bridgend, South Wales. I have received this information via a FOI request to NR, sharing for anyone interested in the future of this line.

The Tondu- Margam branch line is not currently under a T3 possession. The line is operating under a Section C arrangement, where the line is closed by restricting the signaller’s authority to direct trains on to it. The difference between the two is that a possession is a short term closure for engineering work, whereas a Section C is a longer term arrangement providing a reversible closure of the route. Historically, the line was subject to a T3 possession for a number of years, during which it was closed to normal traffic. However, in 2024, the arrangements were revised. This change was made due to the operational and safety complexities associated with maintaining an active line possession.

The line was subject to a T3 possession on 22 June 2018. The line was then put under a section C on the 13 September 2024.

Mothballing3 is proposed via a Short Term Network Change for the immediate future. This proposal has not been formalised or agreed with Train Operating Companies (TOC) or Freight Operating Companies (FOC). However, it includes a commitment by us to reopen
the line within 12 months should a request be received from a TOC or FOC to operate regular services. The line is considered to be of strategic importance and is therefore unlikely to be permanently closed as it provides the only diversionary route for the SWM2 between Margam and Bridgend. Due to current capacity restraints, it is not suitable for use as a routine diversionary route to support engineering works on the main line. Its use would generally be limited to key services during major engineering work unless signalling
enhancements are delivered. The line is included within the Tondu resignalling scheme, which is currently proposed as a Control Period 8 (2029-2034)/ Funding Period 1 (CP8/FP1) item. Reopening of the line may form part of this resignalling programme if capacity is increased and if there is demand for services from Transport for Wales (TfW) or FOCs.
If it really could not support even 1tph in both directions during engineering work on the SWML and it is currently stood down, at 12 months notice of reopening, it sounds pretty tenuous to argue it is really of any strategic importance!

It would be interesting to see how much money is being spent on maintaining and inspecting this neither closed nor open railway.
 