• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Tonbridge Platform 4

Status
Not open for further replies.

reuban

Member
Joined
31 Oct 2020
Messages
14
Location
Kent
What trains use platform 4 at tonbridge, the westbound facing terminating platform?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Farigiraf

Member
Joined
23 Jul 2023
Messages
1,165
Location
Bridge on the River Cam
Today it has Southeastern Tonbridge to New Cross, a Tonbridge to Orpington, and a few Tonbridge to London terminals and back (some of these appear to run empty)
I think it is used for trains coming out of the sidings towards London, but as there are not much Tonbridge-London start/terminators (most go ahead to Hastings or Ashford and further,) the platform doesn't see much use
This is just gathered from some RTT research so excuse me if I'm wrong! :)
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,257
Nice one, and how about its history in the past?
You can go back a week with realtimetrains, (RTT), but there are other online sources that I’m not familiar with. However one thing to bear in mind is that although all services have a planned platform in the working timetable, the signallers can do other things on the actual day. RTT will usually show this if it can by marking the platform number in red.
 

reuban

Member
Joined
31 Oct 2020
Messages
14
Location
Kent
You can go back a week with realtimetrains, (RTT), but there are other online sources that I’m not familiar with. However one thing to bear in mind is that although all services have a planned platform in the working timetable, the signallers can do other things on the actual day. RTT will usually show this if it can by marking the platform number in red.
Sorry I meant long term history, IE alternative uses many years ago
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,941
Location
Airedale
Sorry I meant long term history, IE alternative uses many years ago
The layout at the West end of the station was altered in the 90s in preparation for the Channel Tunnel services. Before that Platforms 3 and 4 were accessible from the original route via Redhill as well as from the Sevenoaks direction.

The station was considerably rebuilt by the SR in the 1930s and from then on P4 (but not 3) was signalled for passenger departures to both routes, which made it more useful, though I don't ever recall it being heavily used. I would imagine it was an ideal place to place parcels vans for unloading/loading.

Without access to the station workings, I can't be more specific, but in the electric/diesel era as well as the Redhill trains there was a school train from/to the Sevenoaks route which probably used it, and in steam days there were random Sevenoaks-Tonbridge trains that could have used it as well as Redhill trains.

There's lots of info here: https://kentrail.org.uk/tonbridge 3.htm
 

GatwickDepress

Established Member
Joined
14 Jan 2013
Messages
2,588
Location
Leeds
I believe platform 4 was used quite considerably for mail traffic before the (now disused) platform at the Royal Mail sorting centre was constructed. Destinations included such exotic locales as Crewe and Preston, among others.
 

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,744
Location
West of Andover
Platform 4 also sees some use during engineering works (i.e. Tonbridge - Paddock Wood) where some trains are extended from Sevenoaks to Tonbridge along with the Hastings 'fast'.
 
Status
Not open for further replies.

Top