bringbackcrouc
Member
- Joined
- 2 Feb 2010
- Messages
- 105
Could we ever reach a position where railway timetables are fixed 18/24 months into the future... i.e. I could book my train travel for summer 2025 now.
I'm trying to book tickets for this half-term and I'm amazed that some of the timetables are not confirmed yet. I've ended up booking a flight instead.
I'm trying to book tickets for this half-term and I'm amazed that some of the timetables are not confirmed yet. I've ended up booking a flight instead.