Philip
On Moderation
What do people think of this idea to try to make the North TPE operations more reliable and improve line capacity across Standedge, without impacting too much on the capacity available on the trains?
1 x tph Liverpool to Newcastle formed of 10 coaches (2 x 802), calling only at Man Vic, Leeds and York and then the normal stopping pattern beyond York.
1 x tph Man Vic to York formed of 5 coaches (1 x 802), stopping at Huddersfield and Leeds.
1 x tph Manchester Airport to Hull (via Guide Bridge) formed of 6 coaches (2 x 185s) and calling at Stalybridge, Huddersfield, Dewsbury, Leeds, etc to Hull.
1 x tph Huddersfield to Hull formed of 6 coaches (2 x 185s) calling at the same stations as the Huddersfield to Leeds shuttle currently does, then selected stations to Hull.
1 x tph Liverpool to Huddersfield via Chat Moss (Northern) using double 195s to make 4-5-6 coach formations, calling at Lea Green, St Helens, Newton and then all stations Man Vic to Huddersfield.
1 x tph to each of Saltburn and Scarborough, using 185s.
A maximum of 4 tph across the Standedge line along with a reduction in services and thus traincrew being less stretched should improve timetable reliability markedly. Also removes the remaining Ordsall Chord service, which should improve reliability through Castlefield.
I know that the big omission in the first one is Huddersfield, but I don't think the platforms there are long enough to accommodate 10 coaches. Would a fast half hourly frequency each with 5-6 coaches between Manchester and Huddersfield suffice, bearing in mind the Northern stopper is also there and that many Manchester to Leeds passengers would be carried by the double Azuma sets (along with the option of going the Calder Valley route)?
If all of the South TPE diagrams were covered by the LHCS sets, it should leave enough 185s to cover the services above and also the shuttles between York and Saltburn/Scarborough.
1 x tph Liverpool to Newcastle formed of 10 coaches (2 x 802), calling only at Man Vic, Leeds and York and then the normal stopping pattern beyond York.
1 x tph Man Vic to York formed of 5 coaches (1 x 802), stopping at Huddersfield and Leeds.
1 x tph Manchester Airport to Hull (via Guide Bridge) formed of 6 coaches (2 x 185s) and calling at Stalybridge, Huddersfield, Dewsbury, Leeds, etc to Hull.
1 x tph Huddersfield to Hull formed of 6 coaches (2 x 185s) calling at the same stations as the Huddersfield to Leeds shuttle currently does, then selected stations to Hull.
1 x tph Liverpool to Huddersfield via Chat Moss (Northern) using double 195s to make 4-5-6 coach formations, calling at Lea Green, St Helens, Newton and then all stations Man Vic to Huddersfield.
1 x tph to each of Saltburn and Scarborough, using 185s.
A maximum of 4 tph across the Standedge line along with a reduction in services and thus traincrew being less stretched should improve timetable reliability markedly. Also removes the remaining Ordsall Chord service, which should improve reliability through Castlefield.
I know that the big omission in the first one is Huddersfield, but I don't think the platforms there are long enough to accommodate 10 coaches. Would a fast half hourly frequency each with 5-6 coaches between Manchester and Huddersfield suffice, bearing in mind the Northern stopper is also there and that many Manchester to Leeds passengers would be carried by the double Azuma sets (along with the option of going the Calder Valley route)?
If all of the South TPE diagrams were covered by the LHCS sets, it should leave enough 185s to cover the services above and also the shuttles between York and Saltburn/Scarborough.