trainmania100
Established Member
Ok so ive just seen an engineering train like no other
Its GBRf operated, and is timed for 50mph max
Its trailing load is an unusual 695 tonnes...
Ive seen 45mph max for Class 7 headcodes but what is special enough to dictate a 50mph max timetable at 695 tonnes diesel locomotive trailing load?
Please see below the timetable in question.
The heacode is 6G12, but why 50mph?
http://www.realtimetrains.co.uk/train/U20063/2017/04/23/advanced
Many thanks
Its GBRf operated, and is timed for 50mph max
Its trailing load is an unusual 695 tonnes...
Ive seen 45mph max for Class 7 headcodes but what is special enough to dictate a 50mph max timetable at 695 tonnes diesel locomotive trailing load?
Please see below the timetable in question.
The heacode is 6G12, but why 50mph?
http://www.realtimetrains.co.uk/train/U20063/2017/04/23/advanced
Many thanks
Last edited: