The Planner
Veteran Member
- Joined
- 15 Apr 2008
- Messages
- 19,658
Moderator note: Split from https://www.railforums.co.uk/thread...uspended-impact-on-next-weeks-service.239141/
Got knocked back. New proposal incoming.Ah the light at the end of the tunnel proverb, be very carefulYour thanks could well be three timetables per year, with all the data management that entails, unless planning timescales are considerably reduced so that planning periods don’t overlap. Anyway I digress.
Last edited by a moderator: