How many panels/ work station will it have once completed
How many panels/ work station will it have once completed
Your guess is as good as ours! What is coming over to the ROC is changing daily.
But put it this way:
9 panels from London Bridge
three bridges has 8/9
Victoria ASC has around 7?
Then you have all the smaller boxes which will make up 5/6 workstations.
Talks of Medway Valley going in there which is another workstation, talks of Ashford going on there which has 6 I believe.
(These are all estimates, I don't know what the exact plan is!)
That's a good question that both the staff and the unions would love to know. The last full Suusex route strategy said there would be 21 workstaions but some of them have been claimed back by LNE route back to York ROC ( http://www.networkrail.co.uk/browse...iture plans/route plans/sussex route plan.pdf ) page 51. Then the 14 ROCs got reduced to 12 with the possibility of Ashford IECC and the Hastings Area coming to TBROC instead. The planning application for the ROC said there would be 48 signalling staff on duty when fully staffed, but that was an assumption way back in 2011 ( http://crawley.gov.uk/pub_livx/groups/operational/documents/plappother/int204794.pdf ).
So who knows, but if they re-configure the Sussex East Coastway workstation into the same type that control the Thameslink end. Then I would say the main Opps floor could take four pods of 10, using the Thameslink pod as my example.
--- old post above --- --- new post below ---
London Bridge ASC now has 7 panels left out of 9.
Victoria ASC now has 10 panels left out of 11.
TBASC has 9 panels (none have migrated yet).
Ashford IECC has 5 workstaions.
Ashford North Kent has 2 workstaions.
Ashford HS1 I beleive is 2 worksations.
I'm not sure it's possible (or cost effective) to change the MCS to a westcad. Although the desk it's sitting on may change soon.
Correct about London Bridge etc, I was counting them 'complete' to give an idea into numbers.
Apparently HS1 won't be going into a ROC, but rumours arife!
. Apparently all the country end workstaions were or are still planned to be MCS and all the London End / Thameslink were or are still planned to be WestCad. Then there's TMS integrated in the not to distant future lmao Isn't TBASC in the ROC now, or still in the old 'box'
Those wanted jobs were found jobs. A couple were displaced, some took voluntary severance the rest got signalling jobs both on our route and the adjacent route.
thanks, so at the moment, job wise, it is going as good as can be.
Another stupid from my good self... Since three bridges has taken over the core signalling, is it 1 panel? As I've noticed that farringdon to elephant is TVS and west hampsterd to farringdon is TWH
At the moment all the areas that have migrated into the ROC have had a "T" added to their excisting codes.
London Bridge From L to TL.
Victoria Eastern from VS to TVS.
West Hamstead from WH to TWH.
Suusex East Coastway is TEB using the old Eastbourne EB code.
So it looks like TBROC is using the old box codes and not line of routes signal codes that the other Re-signalling schemes and ROCs are using.
Another stupid from my good self... Since three bridges has taken over the core signalling, is it 1 panel? As I've noticed that farringdon to elephant is TVS and west hampsterd to farringdon is TWH
Technically one workstation, but with 2 desks. Same as London Bridge Low Level. Double manned during the day, and can be single manned overnight.
Actually, correcting myself. Double personned. Sorry ladies.![]()
Another stupid from my good self... Since three bridges has taken over the core signalling, is it 1 panel? As I've noticed that farringdon to elephant is TVS and west hampsterd to farringdon is TWH
As for the Sussex East Coastway re-signalling, this was a re-signalling however the section of line between Hampden Park and Eastbourne retained some equipment and the signal numbers were unchanged from when Eastbourne signal box controlled it - therefore I presume this could be the reason for the use of the Eastbourne signal box code.
So in theory like vic panel 10