I fear when the new platform comes into use, the ease of interchange between lines at Salford Crescent will be lost and it will be like Bolton in having a large hike between the platforms.

Anyhow photo from this evening when I was waiting for a delayed service.
 

Attachments

  • PXL_20250310_173440881.jpg
    PXL_20250310_173440881.jpg
    4.7 MB · Views: 279
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,595
Location
Greater Manchester
Since this is the edge of the platform (as of 29/03/2025) that was installed over the recent closures, is it safe to assume we probably won't see many more closures since most of the stuff can be done away from the trackside?
On March 1st I passed over on a bus and saw a loco at the far end, so the segments were probably delivered by train.
The start of the new platform at Salford Crescent, the only part in place is the edge of the platform.
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,625
Location
Rochdale
There's another partial closure planned for Sunday the 13th April, the line towards Piccadilly is blocked and on Sunday the 27th the line to Victoria is closed but trains are running through to Piccadilly again :)
 

td97

Established Member
Joined
26 Jul 2017
Messages
1,556
The platform construction is coming on very well, and it seems the majority (if not all) of the riser walls are now installed. Unsurprisingly, the dozer overturning incident isn't mentioned as a project highlight!
Our teams have been carrying out a series of 49-hour possessions to safely deliver a new, 157-metre-long platform at Salford Crescent on behalf of Network Rail.
The possessions support the initial ground works as part of the new £21m project - which will see the creation of the station’s third platform, to improve passenger flow and provide signallers with greater flexibility for trains to move around the network.
This has allowed our teams to start excavating, and concrete pour for the foundations of a new platform riser wall. Our teams have also managed the diversion of 25Kv ATF cables, and dismantled rear walls that clashed with the new platform – before installing the pre-cast riser wall units for the platform face, along with a rear wall of platform pre-cast units.
The team has now successfully created a site that is separate from the railway, to allow our people to work safely Monday-Friday during the day time while trains are operating. The next activities will include piling the foundations for the platform canopy, installing lift shaft piles and pit, and piling for the new footbridge steps
 
Joined
1 Jan 2013
Messages
290
I passed through Salford Crescent station on Friday, and the new platform work is progressing well.
I was wondering if this could be the first "Level Boarding" platform in the north west? We live in hope.
 

jamesst

Established Member
Joined
4 May 2011
Messages
1,369
Location
Merseyside
I passed through Salford Crescent station on Friday, and the new platform work is progressing well.
I was wondering if this could be the first "Level Boarding" platform in the north west? We live in hope.
All of merseyrail is level boarding so no they've beat Salford!!
I'm not sure it would be easy to implement though where different types of stock use the platform.
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,625
Location
Rochdale
I passed through Salford Crescent station on Friday, and the new platform work is progressing well.
I was wondering if this could be the first "Level Boarding" platform in the north west? We live in hope.

Unfortunately the multitude of different unit types using the station mean it will just have to be a generic height, Merseyrail has the bonus of course that it has a single uniform fleet of trains all with the same height passenger doors
 
Last edited:

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,492
Location
Preston Lancs
Salford Crescent notice.jpg
Yes, work is nicely in progress. I love the wording - admitting work can be annoying!

== Doublepost prevention - post automatically merged: ==

A selection of photographs showing the work progressing nicely at Salford Crescent. The Orange Army in action.
 

Attachments

  • Salford Crescent 1.jpg
    Salford Crescent 1.jpg
    105 KB · Views: 95
  • Salford Crescent 2.jpg
    Salford Crescent 2.jpg
    113.5 KB · Views: 94
  • Salford Crescent 3.jpg
    Salford Crescent 3.jpg
    120.3 KB · Views: 96
  • Salford Crescent 4.jpg
    Salford Crescent 4.jpg
    165.5 KB · Views: 99
  • Salford Crescent 5.jpg
    Salford Crescent 5.jpg
    188.9 KB · Views: 97
Last edited:

D9006

Member
Joined
28 Aug 2019
Messages
236
Location
Wigan
Changing trains this morning not been here for a month or 2. I assume the signal in bolton direction will have to be moved

== Doublepost prevention - post automatically merged: ==

The platforms this morning, will MP509 need to moved a bit further along
 

Attachments

  • 20250728_065830.jpg
    20250728_065830.jpg
    2.9 MB · Views: 251
  • 20250728_070353.jpg
    20250728_070353.jpg
    2.4 MB · Views: 246
  • 20250728_065830.jpg
    20250728_065830.jpg
    2.9 MB · Views: 246

driver9000

Established Member
Joined
13 Jan 2008
Messages
4,558
The platforms this morning, will MP509 need to moved a bit further along

Not necessarily as it is a fixed red signal that has a shunt move available to go behind MP510 so unless there is a plan to use it for reversing trains calling there I can't see there being a need for it to be moved.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,492
Location
Preston Lancs
Looking at the set of photos I posted on July 8th and this set today, there is noticeable progress imo which is very encouraging.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,358
Location
Somerset
Unfortunately the multitude of different unit types using the station mean it will just have to be a generic height, Merseyrail has the bonus of course that it has a single uniform fleet of trains all with the same height passenger doors
That’s an inevitability when you decide to standardise boarding height on a system where it hasn’t been standard. For a while you’re spending money for very little gain. A bit like making the first station on the Glasgow subway step free - marvellous publicity but little practical until a second joins it. (Glasgow Subway taken as a theoretical example of a system where no station can be naturally step free as they’re all underground)
 

D9006

Member
Joined
28 Aug 2019
Messages
236
Location
Wigan
Not necessarily as it is a fixed red signal that has a shunt move available to go behind MP510 so unless there is a plan to use it for reversing trains calling there I can't see there being a need for it to be moved.
Thanks for that info
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,406
Location
A typical commuter-belt part of north-west England
In the early 2010s, the station was reworked freeing up a bunch of space on the platform (though making connections to the University less convenient). Access used to be from a ramp leading to footbridge in the university campus and the ticket office was on the platform. There is still a footbridge in the university campus but it no longer serves the station. Instead access is via a new ticket office at main road level outside the tracks. This is connected to the station via a new footbridge.
As part of the current station upgrading works, was any consideration given to putting the missing roof on the footbridge that runs from the booking office to the two platforms currently in use? I have made the walk across it in heavy rain many times over the years.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,595
Location
Greater Manchester
It looks like the roof of the platform has started to be assembled.
Didn't manage to get any good photos thanks to the rain.
 
Last edited:

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,625
Location
Rochdale
As part of the current station upgrading works, was any consideration given to putting the missing roof on the footbridge that runs from the booking office to the two platforms currently in use? I have made the walk across it in heavy rain many times over the years.

Opening windows on a bridge with no roof always amused me! You'd dearly like to hope they would finish the bridge during this round of upgrades
 

bengley

Established Member
Joined
18 May 2008
Messages
1,987
Not necessarily as it is a fixed red signal that has a shunt move available to go behind MP510 so unless there is a plan to use it for reversing trains calling there I can't see there being a need for it to be moved.

It has moved. Now a right handed signal at the end of the new platform
 

Chrisyd

Member
Joined
16 May 2015
Messages
210
Photo showing the state of play Wednesday 24 September.

In the background (top right) you can see the steps up to the ticket office / bridge.PXL_20250924_080118093~2.jpgPXL_20250924_080143718~2.jpg
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,782
Location
Cambridge
Just passed over it on the bus and while I regret I didn't act fast enough to photograph, progress is looking very good indeed. Can't be long now.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,492
Location
Preston Lancs
I know pointing is only cosmetic, but nonetheless, it is usually a finishing touch so really great to see major progress at the station on platform 3.
 

Attachments

  • IMG_0027.jpeg
    IMG_0027.jpeg
    2.9 MB · Views: 141
  • IMG_0028.jpeg
    IMG_0028.jpeg
    2.4 MB · Views: 140

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,492
Location
Preston Lancs
Took a trip to Salford Crescent today to view progress on Platform 3 construction. I will post photographs tomorrow morning. Plenty of orange army activity but looks mainly cosmetic to finish off to me.
 

pokemonsuper9

Established Member
Joined
20 Dec 2022
Messages
4,595
Location
Greater Manchester
Took a trip to Salford Crescent today to view progress on Platform 3 construction. I will post photographs tomorrow morning. Plenty of orange army activity but looks mainly cosmetic to finish off to me.
Yes it was looking quite good last Wednesday (and the Saturday before that).
From Saturday the 10th (panorama):
A photo of the new platform under contruction at Salford Crescent, the floor is mostly complete, but it's still clearly unfinished with cones and a taped off platform edge.

From Wednesday the 14th with people working on it:
Salford Crescent's new platform under contruction with some people in Orange hi-vis working on it
 

Howardh

Established Member
Joined
17 May 2011
Messages
9,774
I'd like to use it - hopefully a train I'm on will actually stop at the new platform so I can alight for the 50 bus!
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,492
Location
Preston Lancs
As promised a few photographs of the 3rd platform at Salford Crescent taken on January 22nd - taken from Platform 2. Shows the main construction work almost complete. Mainly cosmetic work left from what I could see. SC Looking northwest.jpgSC looking NW2.jpgSC looking se 2.jpgSC looking SE.jpgSC overview.jpg
 

Chrisyd

Member
Joined
16 May 2015
Messages
210
Also took photos last Wednesday (22nd January), have only added the ones for ticket office end, as others are just repeats.

PXL_20260121_090446726.jpgPXL_20260121_090442698~2.jpg
 