NorthKent1989
Established Member
- Joined
- 13 May 2017
- Messages
- 2,172
All very nice on paper, but the conflicts and pathing to make something like this work would be crazy. Surely far better to use the existing resources to run a high frequency (every 15 mins?) service from Clapham Junction to Watford Junction? This should still give space for freight paths (they are timed the same as passenger trains from Latchmere Junc to Wembley Yard South Junc if I am reading it right from Real Time Trains). Although not sure that there are the right turnaround facilities at CJ.
It would be a nightmare to run now, of course it could resurface in the 2040s or 2050s as a way to relieve Crossrail if the R25 line ever comes into fruition, in the meantime they should put the crayons away for this one