• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

The Wenlock Branch continued. ......

Status
Not open for further replies.
Joined
21 Feb 2018
Messages
917
This article follows on from five other articles which covered the Wellington to Severn Junction Railway in the Telford area and this line from Buildwas to Presthope. These can be found on the following links/threads:




We begin this next article at Presthope Railway Station and travel towards Craven Arms, as far as the village of Longville in the Dale. …….

http://rogerfarnworth.com/2024/06/27/the-wenlock-branch-from-presthope-to-craven-arms/

The directors of the Wellington & Severn Junction Railway were fully occupied with the line from Wellington to Buildwas. Another company was set up to build the ‘Wenlock & Craven Arms and Coalbrookdale Extension Railway‘. The bill went through the parliamentary process unopposed and authorised the ‘Wenlock Railway Company‘ to construct the line. Work started on 23rd October 1861.

By 5th December 1864, the line was open from Much Wenlock to Presthope. ... At this time, because it was a freight-only line, the Board of Trade saw no need for an inspection of the line. It had already been agreed at a meeting held on 4th December 1863 not to proceed with the line from Presthope to Craven Arms for the time being. It was to be three years after the line reached Presthope before the connection to the Shrewsbury & Hereford Railway close to Craven Arms was completed. It was finally opened on 16th December 1867.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

32475

Member
Joined
2 Nov 2019
Messages
815
Location
Sandwich
A very excellent and thorough piece of research Roger and no less than your usual high standard!
I have a chair and short length of rail which I retrieved from the track bed about 20 years ago close to Rushbury Station (the next stop down the line from Longville) and if memory serves me right there were one or two full length rails left in the undergrowth closer to Longville.
IMG_9291.jpeg
 
Joined
21 Feb 2018
Messages
917
I have seen sleepers on the approach to Rushbury from Longville. Will be posting about the length West from Longville soon. ....
 
Joined
21 Feb 2018
Messages
917
This article follows on from seven other articles which covered the Wellington to Severn Junction Railway and this line from Buildwas to Harton Road Station. It is the final article in this series. ...



== Doublepost prevention - post automatically merged: ==


Much Wenlock Civic Society

I completed the series about this line which ran from Wellington to Craven Arms via Much Wenlock just a couple of weeks ago. This was just in time to allow me to pull together a talk for Much Wenlock Civic Society on Tuesday 17th September 2024.

That talk can be found by following the link below:


While asserting copyright, I have no objections to the file being downloaded and used. Hopefully you will feel something of the joy I found in drawing the photographs and the journey together.
 
Last edited:
Status
Not open for further replies.

Top