rogerfarnworth
Member
- Joined
- 21 Feb 2018
- Messages
- 917
This article follows on from five other articles which covered the Wellington to Severn Junction Railway in the Telford area and this line from Buildwas to Presthope. These can be found on the following links/threads:
www.railforums.co.uk
rogerfarnworth.com
www.railforums.co.uk
We begin this next article at Presthope Railway Station and travel towards Craven Arms, as far as the village of Longville in the Dale. …….
http://rogerfarnworth.com/2024/06/27/the-wenlock-branch-from-presthope-to-craven-arms/
The Railways of Telford again. ....
The Wellington & Severn Junction Railway (W&SJR) - Part 1 This is the first post about the different railway routes in Telford. The W&SJR ran through Lawley and Dawley which are within a mile or so of our home in Malinslee, Telford...
The Railways of East Shropshire (and Telford) – the Much Wenlock and Severn Junction Railway, Buildwas to Much Wenlock.
This article follows on from three other articles which covered the Wellington to Severn Junction Railway and which reached as far along the line as Buildwas. Those articles can be found on these l…
The Wenlock Branch. ...
This is a first article about the Wenlock Branch and covers the length from Buildwas to Much Wenlock. ... http://rogerfarnworth.com/2023/10/19/the-railways-of-east-shropshire-and-telford-the-much-wenlock-and-severn-junction-railway-buildwas-to-much-wenlock/ This article follows on from three...
We begin this next article at Presthope Railway Station and travel towards Craven Arms, as far as the village of Longville in the Dale. …….
http://rogerfarnworth.com/2024/06/27/the-wenlock-branch-from-presthope-to-craven-arms/
The directors of the Wellington & Severn Junction Railway were fully occupied with the line from Wellington to Buildwas. Another company was set up to build the ‘Wenlock & Craven Arms and Coalbrookdale Extension Railway‘. The bill went through the parliamentary process unopposed and authorised the ‘Wenlock Railway Company‘ to construct the line. Work started on 23rd October 1861.
By 5th December 1864, the line was open from Much Wenlock to Presthope. ... At this time, because it was a freight-only line, the Board of Trade saw no need for an inspection of the line. It had already been agreed at a meeting held on 4th December 1863 not to proceed with the line from Presthope to Craven Arms for the time being. It was to be three years after the line reached Presthope before the connection to the Shrewsbury & Hereford Railway close to Craven Arms was completed. It was finally opened on 16th December 1867.
Last edited:
