Additional Notes
- If arriving by bus or coach then you should name the area in addition to the stop name.
- If a move is discovered to be incorrect then the original post should be struck through and the correction made as a new post.
- Should the previous move leave you at a the end of a route for which there are no services timetabled to depart from then you may walk to the nearest stop where services are available.
- So the game remains realistic, you should use the current timetable for the relevant day not including timetable variations for engineering works.
ADJUDICATION CALLED FOR
You will note the emboldened part of the final section of these "Additional Notes" that are shown above and we now already have a problem.
On the Manchester Metrolink system, because of engineering works at the St Peter's Square new extended stop that is part of the new 2CC line under progress of construction,
for a time period of eight weeks from the "quiz date" onwards the normal service pattern is to be totally recast, yet the notes above clearly state NOT to use timetable variations for engineering works.
We have just had a posting from Manchester Piccadilly
(mention being made of the Undercroft) to Shaw and Crompton using the Manchester Metrolink system, but the NORMAL service is from East Didsbury via Manchester
Victoria to Shaw and Crompton, then on to Rochdale. Normally these services NEVER access Manchester Piccadilly.
So, where do we now stand on this eight-week engineering time period that affects the Manchester Metrolink system.