My perception of why things take too long in the UK to build (especially new railways) is because we continuously make do with what infrastructure we have. Almost everything we use in the UK currently is full to capacity at times meaning delays, over crowding, traffic jams and more often than not no alternatives. This means the thing we lose as individuals is "TIME", it takes longer to get anywhere when we don't invest. The EWR project is close to my heart because the 60's robbed Bedford of its east west connections. We had Northampton and Oxford going west and Cambridge and Hitchin to the East. Now we have Bletchley going west which survived by the skin of its teeth. If that had not survived this project would be a non starter and it worries me that the vale line is considered under spec and there is talk of only utilizing small portions of it. If you look at all the East west connections in the country, apart from the GWR which is in alignment with London has had any investment to speak of. The March-Peterborough line still has level crossings that are manned and semaphore signals and that is quite a busy line especially with the freight traffic.
EWR for me is a project which says "North south isn't the only way traffic goes anymore". Lets invest in east west connections whether it be road or rail. For me, EWR is the spear head project which will allow easier connectivity to anywhere by rail. I can't say if EWR is deserved of government funding above all else, but in the grand scheme of things its a project sitting on the back burner for years and years. The original website stated that EWR would open early 2020's if I'm not mistaken (don't shoot me I'm only trying to recollect in my memory banks). The project as I see it hasn't really started until I see photographic evidence of work going on which facilitates the connection of Bicester to Bletchley. It would be nice to see this project move on beyond the point of no return and we ain't there yet. Sadly.
My perception of why things take too long in the UK to build (especially new railways) is because we continuously make do with what infrastructure we have. Almost everything we use in the UK currently is full to capacity at times meaning delays, over crowding, traffic jams and more often than not no alternatives. This means the thing we lose as individuals is "TIME", it takes longer to get anywhere when we don't invest. The EWR project is close to my heart because the 60's robbed Bedford of its east west connections. We had Northampton and Oxford going west and Cambridge and Hitchin to the East. Now we have Bletchley going west which survived by the skin of its teeth. If that had not survived this project would be a non starter and it worries me that the vale line is considered under spec and there is talk of only utilizing small portions of it. If you look at all the East west connections in the country, apart from the GWR which is in alignment with London has had any investment to speak of. The March-Peterborough line still has level crossings that are manned and semaphore signals and that is quite a busy line especially with the freight traffic.
EWR for me is a project which says "North south isn't the only way traffic goes anymore". Lets invest in east west connections whether it be road or rail. For me, EWR is the spear head project which will allow easier connectivity to anywhere by rail. I can't say if EWR is deserved of government funding above all else, but in the grand scheme of things its a project sitting on the back burner for years and years. The original website stated that EWR would open early 2020's if I'm not mistaken (don't shoot me I'm only trying to recollect in my memory banks). The project as I see it hasn't really started until I see photographic evidence of work going on which facilitates the connection of Bicester to Bletchley. It would be nice to see this project move on beyond the point of no return and we ain't there yet. Sadly.