Yesterday, The Royal Wessex (Three Bridges to Weymouth and back) ran almost bang on time all the way there and all the way back as far as Preston Park (near Brighton). It then stayed there about 30 minutes longer than scheduled, getting into Three Bridges at 2200 instead of 2130.

Out of curiosity (having stood in a field for 45mins in the gathering gloom!) does anyone know what caused the delay?
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

4-COR 3142

Member
Joined
27 Nov 2013
Messages
110
Must have been an issue in the brighton area, return leg was on time going through Goring-by-Sea.
 

albertd

Member
Joined
18 Jun 2014
Messages
16
Location
Crawley
Must have been an issue in the brighton area, return leg was on time going through Goring-by-Sea.
Yes, the timings on Real Time Trains showed it as spot on time as far as the arrival at Preston Park, but then about 30 minutes late leaving there. It was definitely 30 minutes late arriving at Three Bridges as I just about saw it (and just about filmed it!)
 
Status