A short but perceptive assessment https://www.cityam.com/the-only-way-to-make-hs2-cheaper-build-hs3/
Yes, the support, particularly financially, is at best flaky for some of these projects.It’s wrong. HS2 is training up people that could do HS3, Crossrail2, NPR, BLE or, like with Crossrail1, a football stadium. HS2 is creating jobs in other companies that are also not strictly tied to high speed rail. The idea that promising future work will enable greater investment is shaky, considering how little promises mean over those timescales. Truss is the only PM of the last 30 years not to have fingerprints on the project (except cost of loans?).
The analogy with the Ford production line is just bonkers. Infrastructure and manufactured goods are entirely different things. Whichever child wrote that article really needs to bone-up before his GCSEs.Yes, the support, particularly financially, is at best flaky for some of these projects.
Lowering the speed requirement would have relaxed many of the complex (and very expensive) technological solutions required for those tunnels though.Whilst I can see the argument I don't agree with the dig about capacity/ high speed, although aren't the ICE around 250/ 275 k so perhaps that might have been sufficient in respect of top speed, although it wouldn't have made a great deal of difference to the output cost given the amount of tunnel.
It would still be a tunnel though, which by its very nature is more expensive than building in the open.Lowering the speed requirement would have relaxed many of the complex (and very expensive) technological solutions required for those tunnels though.
At 300kph with the given cross sections, the humongous 100m tunnel hoods, sophisticated active ventilation systems and the like could all have been jettisoned.
Indeed, it is not unlikely that boring bigger tunnels would have turned out cheaper given the amount of extra stuff that could have been dispensed with.
It is somewhat, but not as much as might once have been expected.It would still be a tunnel though, which by its very nature is more expensive than building in the open.
The article suggests it would have been cheaper to go and ask the French or Germans to just build a replica of their current high speed lines.
But my understanding is that HS2 did consult various countries already running HS rail and they recommended aiming for a high speed to start with. It’s not as if HS2 is wildly out compared to current trains, the Chinese have been running at 350kph since 2008.
Saverne tunnel is 8.9m diameter https://en.wikipedia.org/wiki/Saverne_Tunnel
Chiltern tunnel is 9.1m diameter.
This doesnt look like a massive difference to me, with the hs2 tunnel the larger of the two.
Taking the train speed into consideration, the cross-sectional areas of HS2 tunnels are in general smaller than in other countries, as illustrated in Figure 2. This is a result of a value-engineering process aiming towards an economic tunnel design that accounts for aerodynamic considerations and explains why HS2 cannot simply adopt aerodynamic solutions from HSR systems in Europe or Asia. In total for the Phase One tunnels, using the tunnel sizes in Table 1 rather than the international norms in Figure 2 saves of the order of 1.5Mm3 of tunnel volume, resulting in significant economic and environmental benefits.
Please atleast tell me that HS2 is UIC GC compliant!HS2s tunnels are very different in conception than LGV tunnels, they were shrink wrapped to the smallest possible diameter in claimed pursuit of "sustainability". HS2 even wrote a blog about how they had saved 1.5 million cubic metres of excavation... in exchange for all the technical problems they created. Everyone else in the world has been making tunnels bigger with time as it reduces the challenges on construction and operation.
The new parts are. The captive trains will be GC sized, if they ever exist.Please atleast tell me that HS2 is UIC GC compliant!
HS2 is being built to UIC GC loading/structure gauge except for the platforms which will be at a level boarding but non-standard height of 1200mm.Please atleast tell me that HS2 is UIC GC compliant!