Yeah, I messed up on that when I went to check the map again, my bad. Although isn't the bigger picture the whole journey, so maybe the train can mae up the difference on it's leg of the journey?About 30 miles wider!
Yeah, I messed up on that when I went to check the map again, my bad. Although isn't the bigger picture the whole journey, so maybe the train can mae up the difference on it's leg of the journey?About 30 miles wider!
The ferry used to compete with the Eurotunnel from Dover. Unless the gap is somehow wider?
Your ferry leg alone will likely be so slow as to kill the combined journye even if the railway was replaced with a teleporter.Yeah, I messed up on that when I went to check the map again, my bad. Although isn't the bigger picture the whole journey, so maybe the train can mae up the difference on it's leg of the journey?
If you're taking the bigger picture into account, people will have to get to the train. Most people don't live within walking distance of Euston.Yeah, I messed up on that when I went to check the map again, my bad. Although isn't the bigger picture the whole journey, so maybe the train can mae up the difference on it's leg of the journey?
I would have thought the plan would be to have all 3 you point out under phase 2b, as that would partly explain the IRP. If it's all still separate, the only excuse at that point is that the Government are tight fisted. Politically it makes sense to have it under one roof to justify the change, unless they've forgotten how to do even that.In theory, Parliament might be able to consider a second hybrid bill at the same time if the government were to deposit one in the House of Lords first. But that seems reasonably unlikely to happen.
So, for any work that doesn't fit within the consents processes available under the Transport & Works Act, or Nationally Significant Infrastructure Projects in the Transport Sector, there is currently a long queue:
High Speed Rail (Crewe - Manchester) Bill
'Northern Powerhouse Rail' Bill
High Speed Rail (West Midlands - East Midlands) Bill
Obviously I don't actually know what their names will be these are just guesses.
The first could still receive Royal Assent in time for 2024 and the end of the session. That leaves the upcoming two Parliaments to pass the latter two. I will be surprised if this is complete by 2030. It could still be done but perhaps 2032 is a reasonable timetable to allow.
Of course the other two mechanisms might be suitable. I don't really know. Would anyone like to pass opinion on short stretches of new build high speed rail being authorised by orders under the Transport & Works Act or through the Nationally Significant Infrastructure process?
It's also worth noting that for projects to proceed in a timely fashion the Transport & Works channel cannot be overloaded with more than a handful of large applications simultaneously. For example I think currently there are four applications of varying sizes under consideration by the Secretary of State?
I don't think they can because Crewe - Manchester is almost ready, but Manchester - Marsden hasn't even gone to consultation yet.I would have thought the plan would be to have all 3 you point out under phase 2b, as that would partly explain the IRP. If it's all still separate, the only excuse at that point is that the Government are tight fisted. Politically it makes sense to have it under one roof to justify the change, unless they've forgotten how to do even that.
According to the government, TWAO are not really for tracks longer than a couple of km:Of course the other two mechanisms might be suitable. I don't really know. Would anyone like to pass opinion on short stretches of new build high speed rail being authorised by orders under the Transport & Works Act or through the Nationally Significant Infrastructure process?
Larger schemes on the national railway network in England(tracks more than 2km) are likely to qualify as ‘Nationally Significant Infrastructure Projects’ and require development consent under the Planning Act 2008 rather than a TWA order.
Construction of a railway is within section 14(1)(k) only if—
(a)the railway will (when constructed) be wholly in England,
(b)the railway will (when constructed) be part of a network operated by an approved operator,
[F1(ba)the railway will (when constructed) include a stretch of track that—
(i)is a continuous length of more than 2 kilometres, and
(ii)is not on land that was operational land of a railway undertaker immediately before the construction work began or is on land that was acquired at an earlier date for the purpose of constructing the railway,] and
(c)the construction of the railway is not permitted development.
Ah ha. So only the shortest of bypasses could be considered through that route, or 'on line' high speed conversion.According to the government, TWAO are not really for tracks longer than a couple of km:
![]()
Transport and Works Act orders: a brief guide
Outlines the procedures involved in applying for a Transport and Works Act order.www.gov.uk
The Planning Act 2008 gives further details:
Planning Act 2008
An Act to establish the Infrastructure Planning Commission and make provision about its functions; to make provision about, and about matters ancillary to, the authorisation of projects for the development of nationally significant infrastructure; to make provision about town and country...www.legislation.gov.uk
Of course the other two mechanisms might be suitable. I don't really know. Would anyone like to pass opinion on short stretches of new build high speed rail being authorised by orders under the Transport & Works Act or through the Nationally Significant Infrastructure process?
How interesting.It would have to be DCO. Quite conceivable that it could be used for Coleshill - Kegworth.
I‘m no expert, but I bet no one ever considered going to the Solent via Brighton…Years ago , when I had a job - mulled over Heathrow to Reading (there were plans for a new line at one time) - then new build towards Basingstoke skirting the Reading built up area with a grade seperated junction towards Micheldever and serving the Solent conurbation , with 4 tracking towards Bristol Parkway giving the latter and Wales a much faster link......
Both would relieve what is now SWT and FGW inwards from Reading.....sort of route where the volume is (or was) - M4 relief
Bit tricky with the South Downs and a fairly narrow coastal plain , mostly developed.I‘m no expert, but I bet no one ever considered going to the Solent via Brighton…
There's probably quite a few places like that in the UK. I know there are plans floating about for using old freight lines in Liverpool to bring HS2 in on, for example.Bit tricky with the South Downs and a fairly narrow coastal plain , mostly developed.
Actually "my idea" (a phrase one should shudder over here) - would have been new line to around Wooten Basset junction with 4 tracking of what people used to refer to as the South Wales direct line. Nowadays with no imported coal from Avonmouth , - you could just go for a 140 mph+ upgrade on the existing line and save some £...
It's hard to make a dent in London - Bristol Parkway running times with just a 140mph improvement - yes there are some non-stop services but barely off the ground before the pandy, and they'd not be viable for a new build without increasing capacity to the intermediate stations - and tying in some new markets (via Winchester seems more realistic)
Slough, Reading, Swindon, Didcot and Oxford are larger rail markets to London than Cardiff, Bristol and Bath etc... a new line needs to be running 12+ tph - so if the tph are avoiding the demand centres, where are they all going?
Well technically people could also use it who also have access to HS2, like people from Birmingham, except since it's in London it has more political will than just a straight line between Birmingham and Bristol/Cardiff.It's hard to make a dent in London - Bristol Parkway running times with just a 140mph improvement - yes there are some non-stop services but barely off the ground before the pandy, and they'd not be viable for a new build without increasing capacity to the intermediate stations - and tying in some new markets (via Winchester seems more realistic)
Slough, Reading, Swindon, Didcot and Oxford are larger rail markets to London than Cardiff, Bristol and Bath etc... a new line needs to be running 12+ tph - so if the tph are avoiding the demand centres, where are they all going?
Did anyone ever have trains with the performance characteristics we have now though?I‘m no expert, but I bet no one ever considered going to the Solent via Brighton…
HS2 also for the most part helps people get to and from Birmingham quicker. Well, except Leeds becuase apparently spending 2p extra to get to the ECML is too much money for our government, but that's a different story.Did anyone ever have trains with the performance characteristics we have now though?
We have trains that can eat up over three miles every minute in common use globally. Lines with capacity far greater than anything we have in the UK outside of HS2.
The old rules about "direct routes" no longer apply in anything like the same way they used to. Now the objective is to ensure sufficient traffic can be gathered onto the alignment.
Did anyone ever really consider going to Nottingham via Birmingham in the time before high speed rail proposals?
Going to the Solent via Brighton allows the line to unload multiple main lines from multiple termini and still match or beat the existing journey times.
It eats up a lot of the long distance traffic out of multiple termini and Thameslink.
Did anyone ever really consider going to Nottingham via Birmingham in the time before high speed rail proposals?
I did muse about OOC-Plymouth via Southampton, Bournemouth and Taunton ( which dodges some hills & lets you go down a valley to Exeter ) but didn't consider via Brighton too. That'd connect most of the south coast in one go which IIRC is not unpopular and also a pretty awkward journey at times, but no idea *how* popular.
However...sending the southwest via Brighton to get anywhere at all is not particularly attractive to this resident at least either & you can bet there'd be no new link between Taunton & Birmingham if that went through...
Old Oak common could also be designed in such a way as to allow through HS2 trains.Well before we can talk about anything in detail we do have to work out what termini we would use since that decides the London station requirements.
There are a few choices I can see:
- Paddington and Old Oak Common - this is a tough one given the lack of much relief to services out of Paddington, only potentially the Cornwall/Devon trains, but crossrail related shenanigans might be able to shake loose some platforms. The real star of the show here is Old Oak Common, with same station interchange with regular GWML services, Crossrail and HS2.
To illustrate this, the construction of the Great Belt Fixed Link in Denmark cut the travel time for the 11-mile journey across the strait from an hour by ferry to less than ten minutes by rail.Your ferry leg alone will likely be so slow as to kill the combined journye even if the railway was replaced with a teleporter.
Ferries are not fast. Especially when loading and unloading are considered.
Can anyone comment on the locations of the major bottlenecks, other than platform capacity, of the South London termini?
Doesn't that mean the ferry had an average speed of 11mph? Surely that could be sped up? At 22mph it 'only' takes half an hour. Find a short enough crossing, and it starts to look feasible.To illustrate this, the construction of the Great Belt Fixed Link in Denmark cut the travel time for the 11-mile journey across the strait from an hour by ferry to less than ten minutes by rail.
That said, it's just one example and very definitely not carte-blanche to build bridges and tunnels wherever one pleases!
Doesn't that mean the ferry had an average speed of 11mph? Surely that could be sped up? At 22mph it 'only' takes half an hour. Find a short enough crossing, and it starts to look feasible.
I was thinking about it in general. Like with high speed rail to Ireland. Maybe with a 'shorter' distance, say between Scotland and Belfast, you could get a high enough average speed with a ferry for it not to take much longer than a plane?There's a lot of faffing about involving putting a train on the ferry rather than running one over the bridge.