Unfortunately at least one of the engineers behind HS2 does not appear to grasp this, with consequences which do no favours to his professional reputation.
I think you mean HSUK, rather than HS2, but great post.
Unfortunately at least one of the engineers behind HS2 does not appear to grasp this, with consequences which do no favours to his professional reputation.
Oops yes, I did. Now corrected. Thank you.I think you mean HSUK, rather than HS2, but great post.
Are you sure you're asking the right question? Arup are in the business of making money, so if Government was already making noises about supporting HS2, then that's the place they would want to be, and the last thing they would do at that stage would be to assess the merits of a different project. I really don't see why any other engineering firm would be wanting to support a project different to that where Government has already shown every sign of putting its money.If you want to look at how to go about offering a counterproposal to the route of a high speed line, Arup's work on HS1 is an exemplar. Arup had the breadth of professional expertise and understood the need to get political buy-in. HSUK have none of this. Even if their proposals had merit (and having looked at them for some years now I really don't think they do), they have gone about it in a completely counterproductive way. What is really telling is that no engineering design firm has picked up their proposal. If their ideas had such obvious merit, you would expect Arup or somebody to bring them on board and develop the concept.
The time the HSUK proposals should have been assessed was before HS2 was the favoured route,
If Government and others had looked at this properly before 2010, WITHOUT the Heathrow influence, and with a focus on the future needs of railways for the UK as a whole rather than simply relieving WCML, we might now have a much more promising future for our railway system.
London to Holyhead is a smidge under 300 miles, with HS2 lets say that's possible in 1.5 hours. The current Fast Ferry takes 2h15 hours to Dublin. So total travel time of 3h45 hours + (say) 20 mins checkin, for 4h05 mins total.
Ryanair offer 1h15 flights from Gatwick, which is itself 20-30 mins from Victoria. Allowing 1hr for check-in to be generous, and taking a rough transfer time of Dublin Airport to City Centre of 30mins, you're left with 45 mins to get from gate to taxi rank and still beat the ferry.
I've seen all of this and I understand it, and I see why you're so supportive of the HS2 route, but with all due respect, have you not always seen this purely in the context of the route having to have Heathrow as a major priority?as I’ve said before - what became HS2 considered all manner of routes and options before the favoured corridor was selected. I personally looked at routes up the east side and near the M1 in the very early days, indeed had to persuade some very senior people that ‘west is best’ as, frankly, that was where the socio-economic benefit is, by far.
HSUK came about in reaction to HS2, ie after all this work was already done. Why do it again? Or more accurately, why use the workings of two retired engineers with nothing better to do with a month or two of their time, than use the work you’ve already done using the time of dozens of transport planners, environmental specialists, economic modellers and engineers over a year or more? Why would you do it?
Had Government done this, again, ie spent money looking at something it had already looked at, and taken leave of its senses and pursued it, it wouldn’t have happened, as it would fail the economic tests, and have the whole country against it as the impact on local dtakeholders would be far more widespread and far more disruptive.
you’ll have to trust me, HS2 was the right answer then and is the right answer now. All those independent reviews can’t be wrong!
If (one of) the objective(s) was to serve Heathrow, where else would the line go?So my question as above remains, ie if Government and others had looked at this from the outset with their top priority as the future needs of railways for the UK as a whole rather than simply relieving WCML, and with Heathrow being served similarly to how it is in the HSUK proposal rather than being top priority, would the route really still have gone through the Chilterns?

I've seen all of this and I understand it, and I see why you're so supportive of the HS2 route, but with all due respect, have you not always seen this purely in the context of the route having to have Heathrow as a major priority?
So my question as above remains, ie if Government and others had looked at this from the outset with their top priority as the future needs of railways for the UK as a whole rather than simply relieving WCML, and with Heathrow being served similarly to how it is in the HSUK proposal rather than being top priority, would the route really still have gone through the Chilterns?
Arup is employee-owned via a trust, so while it is in the business of making money it has no shareholders to answer to. This gives it considerable leeway to develop alternative proposals and then lobby for them. It did this very successfully on HS1, despite the government's previously preferred route being quite well-advanced. If anyone was going to offer a viable alternative to HS2 it would have been Arup. But they didn't. Why didn't they, if they had done so successfully with HS1? There was nothing stopping them doing the same for HS2, other than that they didn't see any merit in the alternatives.Are you sure you're asking the right question? Arup are in the business of making money, so if Government was already making noises about supporting HS2, then that's the place they would want to be, and the last thing they would do at that stage would be to assess the merits of a different project. I really don't see why any other engineering firm would be wanting to support a project different to that where Government has already shown every sign of putting its money.
That sounds like your confirmation that Heathrow was paramount. As do your next comments.No - as I said above the early work looked at all sorts of routes and options. Difficult to serve Heathrow on a route up the east side of the country...
So from your work on the project, what percentage of HS2 users will want to use Heathrow, in preference to Birmingham (or Manchester)? Noting that HS2 will go somewhere near to Heathrow a while after leaving Birmingham. And noting that Birmingham has a much less onerous airport than Heathrow, which serves many of the European and a good few other places that Heathrow does. Similar comments about Manchester too, which serves even more of the European and many further afield places that Heathrow does. You say this is big bucks, but just how big?But, like it or not, Heathrow is a big generator of (domestic) long distance traffic, both by surface transport and air. Capturing a slice of that market is worth big bucks. Therefore, when taking an initial look at options, a route that could somehow serve Heathrow was chosen. I wouldn’t say it was top priority though. Top priority was serving London - West Mids conurbation - with a fast connection onto the North West and Scotland. This is where the greatest economic activity is, where the existing transport routes are most congested, and where the greatest benefits are. Heathrow - being very nearly on the way, adds to the case.
You and I both know this is a flippant comment, and that I was referring to the chosen HS2 route.Yes. Given that the Chiltern hills stretch to Hitchin, as anyone who has cycled up Hexton will testify. There is no doubt the line would have gone through the Chilterns
Because, as others in this thread have said, Government wanted it to serve Heathrow.Arup is employee-owned via a trust, so while it is in the business of making money it has no shareholders to answer to. This gives it considerable leeway to develop alternative proposals and then lobby for them. It did this very successfully on HS1, despite the government's previously preferred route being quite well-advanced. If anyone was going to offer a viable alternative to HS2 it would have been Arup. But they didn't. Why didn't they, if they had done so successfully with HS1? There was nothing stopping them doing the same for HS2, other than that they didn't see any merit in the alternatives.
You don't seem to be understanding what I'm saying. Arup put forward an alternative to HS1. They changed they government's mind on the HS1 route by convincing them that there was a better option. They could have done the same on HS2 if they had felt so inclined. There was nothing to stop them. Arup pride themselves on thinking outside the box, doing stuff that other companies wouldn't or couldn't. If they thought there was a convincing case for a different route, it wouldn't have mattered to them what the government's initial preferences were. They'd convinced the government to change its mind on HS1, why not HS2?Because, as others in this thread have said, Government wanted it to serve Heathrow.
That sounds like your confirmation that Heathrow was paramount. As do your next comments.
So from your work on the project, what percentage of HS2 users will want to use Heathrow, in preference to Birmingham (or Manchester)? Noting that HS2 will go somewhere near to Heathrow a while after leaving Birmingham. And noting that Birmingham has a much less onerous airport than Heathrow, which serves many of the European and a good few other places that Heathrow does. Similar comments about Manchester too, which serves even more of the European and many further afield places that Heathrow does. You say this is big bucks, but just how big?
You and I both know this is a flippant comment, and that I was referring to the chosen HS2 route.
== Doublepost prevention - post automatically merged: ==
Because, as others in this thread have said, Government wanted it to serve Heathrow.
I've seen all of this and I understand it, and I see why you're so supportive of the HS2 route, but with all due respect, have you not always seen this purely in the context of the route having to have Heathrow as a major priority?
So my question as above remains, ie if Government and others had looked at this from the outset with their top priority as the future needs of railways for the UK as a whole rather than simply relieving WCML, and with Heathrow being served similarly to how it is in the HSUK proposal rather than being top priority, would the route really still have gone through the Chilterns?
Well it's all about cities served. The important ones being Birmingham, Manchester, Sheffield, Leeds, York and Liverpool. But not just to London, to each other as well. We can all agree HS2 has failed at that, but how would you best serve all of them, with as little cost as possible?If (one of) the objective(s) was to serve Heathrow, where else would the line go?
Here is a map with some straight lines drawn on it. There's very little difference between going via (near) Heathrow and not.
View attachment 109633
Well it's all about cities served. The important ones being Birmingham, Manchester, Sheffield, Leeds, York and Liverpool. But not just to London, to each other as well. We can all agree HS2 has failed at that, but how would you best serve all of them, with as little cost as possible?
You may say this is another subject, but it's actually very relevant to this discussion.From Manchester, something like 70-80% of domestic passengers to Heathrow are connecting there. They will almost certainly all be on the train in 10 years time. Albeit that’s another subject.
Why are you calling HSUK a single project? I've never disagreed with people who have said HSUK wasn't presented as well as it might have been, what I've said is that some of it had merit which should have been used to advantage for the benefit of UK railways as a whole. Which means that HSUK, or a project loosely based on it, should have been seen as a first stage (eg. London to Yorkshire) of a bigger project. Seeing HSUK only in its entirety is an unnecessary distraction.The "problem" with HS2 which HSUK tries to deal with is doing everything, which no single project should ever try to do.
HSUK's own authors conceive it as a single project. They make a big song and dance that it serves the whole of the country - contrasting it with HS2 which they allege has a more limited scope. So I'm not sure why you would want to split it down into stages. If you're doing that, you also need to treat HS2 as a first stage of a national network, otherwise you're not making a valid comparison.Why are you calling HSUK a single project? I've never disagreed with people who have said HSUK wasn't presented as well as it might have been, what I've said is that some of it had merit which should have been used to advantage for the benefit of UK railways as a whole. Which means that HSUK, or a project loosely based on it, should have been seen as a first stage (eg. London to Yorkshire) of a bigger project. Seeing HSUK only in its entirety is an unnecessary distraction.
Isnt there a decent chance of airport traffic the other way? If you can get from London to Birmingham (and maybe Manchester) airports in a decent time there may be a flow of passengers such that airlines fly long haul from those airports with more (and presumably cheaper) slots available??You're suggesting that passengers heading from Manchester to Heathrow will migrate towards rail travel to get between Manchester and London.
London already has several airports with cheaper slots than Heathrow - Gatwick, Stansted, Luton. But I guess someone living in West London would find it more convenient to use OOC to get to Birmingham or Manchester airports than travelling to the alternatives around London. I doubt it would be for long haul flights though - Heathrow dominates that market. It's more likely to be short haul to holiday destinations.Isnt there a decent chance of airport traffic the other way? If you can get from London to Birmingham (and maybe Manchester) airports in a decent time there may be a flow of passengers such that airlines fly long haul from those airports with more (and presumably cheaper) slots available??
True, but Birmingham will have its own market plus some of London and eventually Manchester and the East Midlands, so flights from there will become more viable.London already has several airports with cheaper slots than Heathrow - Gatwick, Stansted, Luton. But I guess someone living in West London would find it more convenient to use OOC to get to Birmingham or Manchester airports than travelling to the alternatives around London. I doubt it would be for long haul flights though - Heathrow dominates that market. It's more likely to be short haul to holiday destinations.
I think the reverse will happen. With current surface transport links, only one major international hub airport has developed in the UK. HS2 will effectively merge the demand for air travel from London, Birmingham, East Midlands and Manchester into a single market (it could be argued the UK already is a single market as far as long haul goes). This will encourage further specialisation in the markets each airport serves. Birmingham may attract some passengers from London, but the reverse will also happen. Long haul operators will look to consolidate operations. The only impediment would be maxing out capacity at Heathrow and the 3rd runway being canned. But in that case the first operators moving from Heathrow to Birmingham or Manchester would be short haul.True, but Birmingham will have its own market plus some of London and eventually Manchester and the East Midlands, so flights from there will become more viable.
HS2 SHOULD have been the first stage of a bigger network, which is why HS3 was talked about later, and HS4 etc. HS2 SHOULD have been designed with the NW, Yorkshire, the NE, Scotland etc as subsequent parts of the same big project, to be developed when funding could be found. But in practice it was seen and promoted as a single project to run only to Birmingham, necessarily with a link to Heathrow, to relieve WCML, and with Manchester as a possible add-on. Perhaps someone might correct me, but I didn't think there was much, if any interest in any sort of an eventual HS network for the UK, when HS2 was being pushed prior to 2010.HSUK's own authors conceive it as a single project. They make a big song and dance that it serves the whole of the country - contrasting it with HS2 which they allege has a more limited scope. So I'm not sure why you would want to split it down into stages. If you're doing that, you also need to treat HS2 as a first stage of a national network, otherwise you're not making a valid comparison.
You're applying a very particular spin to promote your prejudged views on the motivations behind HS2. And it's self-contradicting. How can it run "only to Birmingham" also have "Manchester as a possible add-on"?But in practice it was seen and promoted as a single project to run only to Birmingham, necessarily with a link to Heathrow, to relieve WCML, and with Manchester as a possible add-on. Perhaps someone might correct me, but I didn't think there was much, if any interest in any sort of an eventual HS network for the UK, when HS2 was being pushed prior to 2010.
You're suggesting that passengers heading from Manchester to Heathrow will migrate towards rail travel to get between Manchester and London. This seems a little hopeful when there's a perfectly good airport in Manchester which has numerous daily flights directly into Heathrow, so why would passengers migrate towards rail travel for this part of their journey?
But okay, let's assume that they will for whatever reason, eg. encouragement of sustainable travel. In which case how can you possibly follow this line of thinking without applying it to travel from the UK to mainland Europe? And the cancelling of the HS2-HS1 link?
Is that definitely the case? If someone is connecting with British Airways, the flight from Manchester will arrive in T5, so it's an easy connection. You're only checking in once, whether at MAN (flying down) or LHR (taking HS2 down).But most importantly, it will be a minimum of an hour quicker by HS2 than by plane, when you take into account check in / security time and minimum connection times at Heathrow / OOC. This is based on a common journey to Manchester Airport / Manchester Airport HS2 station. For many people across the North West it will be even quicker due to being closer to Piccadilly (or another station served by HS2 trains) than the airport. It is also likely to be cheaper for most times of day / week, once built those seats will need filling.
It's a minimum 1 hour connection even within T5: https://www.britishairways.com/cms/global/pdfs/UKM5629_T5_Online_Ticket_Wallet.pdfIs that definitely the case? If someone is connecting with British Airways, the flight from Manchester will arrive in T5, so it's an easy connection. You're only checking in once, whether at MAN (flying down) or LHR (taking HS2 down).
And most people using MAN don't live that near Piccadilly or the airport. Taking a taxi or driving to the airport, to me sounds easier than getting to the HS2 station, then changing again at OOC, and checking in at LHR.
Is that definitely the case? If someone is connecting with British Airways, the flight from Manchester will arrive in T5, so it's an easy connection. You're only checking in once, whether at MAN (flying down) or LHR (taking HS2 down).
And most people using MAN don't live that near Piccadilly or the airport. Taking a taxi or driving to the airport, to me sounds easier than getting to the HS2 station, then changing again at OOC, and checking in at LHR.
I was wondering what the pre-WCML modernisation flight numbers were. Never thought it would be that many. Astonishing.15 years ago there were nearly 30 flights a day MAN- London each way. The WCML timetable and pricing has seen most of them off, HS2 will just about finish the job.
Whenever I’ve looked at flights to the UK from Canada, the price to Heathrow or Gatwick has been less (by about £30 or more) than those to Manchester, Birmingham or elsewhere in Britain.Isnt there a decent chance of airport traffic the other way? If you can get from London to Birmingham (and maybe Manchester) airports in a decent time there may be a flow of passengers such that airlines fly long haul from those airports with more (and presumably cheaper) slots available??
One advantage of a BA connecting flight from Manchester, is that if the flight is delayed and you miss your BA flight out of Heathrow, BA are responsible and will have to rebook you, whereas if there's trouble on the rail journey down and you miss the flight, you're on your own.yes, you are checking in only once, but with an air transfer you have a much longer wait than the train connection.
The flight time MAN-LHR (1h15) is pretty close to the train time MAN HS2 - LHR even allowing for the OOC change (1h30). And when you transfer flights at Heathrow, you will be given at least 1h15 interchange time. Often much more - 3h plus. Hence a minimum 1 hour Betterment, and usually more.
Of course; I used the example of the airport vs HS2 station as there will be negligible difference unless you live in Ringway Road itself. However most people in the North West *do* live nearer an HS2 served station than the airport, and the journey time difference will be greater than 1 hour even in the best case.
I agree that some people will prefer the (slightly) easier way of flying down, but many will prefer to save the hour (at least), and their cash, and get the train. And because many will, the number of flights provided will reduce, which means more will use the train, etc.
15 years ago there were nearly 30 flights a day MAN- London each way. The WCML timetable and pricing has seen most of them off, HS2 will just about finish the job.