• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

The next station is...!

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

VT 390

Established Member
Joined
7 Dec 2018
Messages
1,737
  1. If someone has started a new leg after incorrectly deciding they have won the previous leg then the adjudicators award them no points for that leg, so be careful!

Does this not apply as I started the next one before the previous one was completed or does it mean it continues anyway?
 

A Challenge

Established Member
Joined
24 Sep 2016
Messages
2,837
HALT (PENDING ADJUDICATION)

Previously we've allowed it to continue when it is only the opening post
 

Esker-pades

Established Member
Joined
23 Jul 2015
Messages
3,784
Location
Beds, Bucks, or somewhere else
ADJUDICATION:

Gameplay continues from the last valid post, which was Mussleburgh.

Errors:
  • Dunbar to Drem is not a valid move
  • North Berwick is not a win
There is a precedent for adjudicators to resurrect incorrectly finished legs and the rules do not preclude this.

HOWEVER, if @VT 390 wins this leg, they will be awarded no points for their win as they had previously declared a win which was not valid, as per the rules.

I also request that @A Challenge 's post of Mussleburgh has all additional text removed to aid clarity.

The following posts must be struckthrough:

North Berwick
 

Top