Buttsy
Established Member
Hatton
Widney Manor
That would appear to be a winning move
In case this comes up, as there are no separate tables issued in the National Rail Timetable, in my opinion there is no case that the Selby swing bridge works span a timetable period so should not gain entry to the red section.In the event of long-term engineering works, these should be ignored unless they span a timetable period and are noted in the National Rail Timetable.