Robinson
Member
Johnstone
Table 82 of the National Rail Timetable shows a separate period for the duration of the works, between the 21st of July and the 31st of August inclusive.Temporary disruptions, such as landslips or flooding, should be ignored unless the disruption period exceeds one month.
Mount Florida