• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

The next station is...!

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Robinson

Member
Joined
1 Aug 2010
Messages
623
Location
Helensburgh
Chestfield & Swalecliffe

I checked before playing Faversham to see if there was any possibility of a "cunning plan" by going this way...
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,399
Location
A typical commuter-belt part of north-west England
Birchington-on-Sea
--- old post above --- --- new post below ---
Burnley-Hebden Bridge I agree with.

Pwllheli-Machynlleth should be either Pwllheli-Dovey Jn or Pwllheli-Harlech, as Dovey Jn-Machynlleth is still available with Aberystwyth trains. I am unclear as to how long Harlech-Dovey Jn is expected to be closed for, and hence whether the closure will exceed a month.

Dorking-Horsham has now reopened for a limited peak service. All trains call at all stations. As there are only two northbound trains, the northbound moves for this stretch will score a long wait bonus until the service improves.

It is still possible that the Isle of Wight closure will exceed a month and hence end up on the list, this is at the moment an unknown.

Comments for consideration

1)....Is it up to contestants to notify any changes in this new "red print" section and if so, who are they supposed to notify, as only adtrainz as the quiz-setter whose first post on the thread is and any of the three forum quizmasters have the power to make amendments to that particular posting.

2)....The Island Line can only come into play should a new leg use the Isle of Wight stations only, which would be an exceedingly short leg indeed.

3)....When I check with Network Rail, they claim the line from Machynlleth up to Pwllheli is out of commission whilst the works to repair the sea defences are in progress then when these are effected, the first reported Pont Briwet bridge works will then see Harlech as the northerly temporary terminus of the Cambrian Coast Line until 2015 when the new rail bridge will be commissioned. I have been told that the old bridge will never carry a rail service ever again.
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,887
Location
West Country
Burnley-Hebden Bridge I agree with.

Pwllheli-Machynlleth should be either Pwllheli-Dovey Jn or Pwllheli-Harlech, as Dovey Jn-Machynlleth is still available with Aberystwyth trains. I am unclear as to how long Harlech-Dovey Jn is expected to be closed for, and hence whether the closure will exceed a month.

Dorking-Horsham has now reopened for a limited peak service. All trains call at all stations. As there are only two northbound trains, the northbound moves for this stretch will score a long wait bonus until the service improves.

It is still possible that the Isle of Wight closure will exceed a month and hence end up on the list, this is at the moment an unknown.
I shall amend the information regarding Dorking-Horsham accordingly, including information regarding the bonus.
Comments for consideration

1)....Is it up to contestants to notify any changes in this new "red print" section and if so, who are they supposed to notify, as only adtrainz as the quiz-setter whose first post on the thread is and any of the three forum quizmasters have the power to make amendments to that particular posting.

2)....The Island Line can only come into play should a new leg use the Isle of Wight stations only, which would be an exceedingly short leg indeed.

3)....When I check with Network Rail, they claim the line from Machynlleth up to Pwllheli is out of commission whilst the works to repair the sea defences are in progress then when these are effected, the first reported Pont Briwet bridge works will then see Harlech as the northerly temporary terminus of the Cambrian Coast Line until 2015 when the new rail bridge will be commissioned. I have been told that the old bridge will never carry a rail service ever again.
1) Whilst there is no formal decision on how this should be done, I would have thought it be best if you either posted in thread of any changes, or PM either adtranz or one or the quizmasters (probably me as the other two aren't regulars on this thread!).

2) I will add the Isle of White to the list: unlikely though it will be used.

3) I would be inclined to agree with Clagmonster, as I understand the closure strictly is from Dovey Junction, since I'm presuming that Aberystwyth services are still running?
 

Top