Oh the linespeed is 15mph from the double yellow in, so not increasing the approach speed as alluded to earlier!
I suspected as much and I've just confirmed the same from the sectional appendix so you're right in this case the arrangement gives no advantage at all in this respect.
The problem is clause 3.1.3 in this document:
http://www.rgsonline.co.uk/Railway_...ng/Railway Group Standards/GKRT0044 Iss 2.pdf
which states:
"The distance between the protecting signal and the rear of the first train shall be minimised, as far as reasonably practicable, without compromising other requirements for signal positioning."
Now I would argue that providing an extra signal in this case is not a "reasonably practicable" way of ensuring the distance is minimised, taking all things into account, including the cost and subsequent maintenance of all that extra equipment. However as I explained before when the layout was designed all these requirements were being rushed in as a response to a string of permissive incidents in platforms so it's possible the designers went over the top, probably in an attempt to protect their individual and corporate butts. More recent designs probably wouldn't have those extra signals, at least approaching a terminal where they can provide no additional benefits.
PARS was not in my view amongst the most successful of signalling projects accomplished during that late Railtrack - early NR period for a number of reasons, although it did have some good modern features such as axle counters fitted throughout. Not long after, Siemens were removed from the contractors list for such major schemes, although they've since re-entered the UK market in a serious way by acquiring the rail signalling assets of Invensys, including the long established respected expertise and products of Westinghouse.