The longest guided busway in the world, when's it opening ?

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
Hopefully never, reinstating the railway from Huntingdon-St Ives-Cambridge would have been so much better, would have been useful for EC diversions too.
 

Class20

Member
Joined
2 Aug 2010
Messages
232
Location
Bamber Bridge
The council have been unwilling to put a final opening date for the busway since the end of 2009 when the opening date was missed for about the 4th time.

BAM Nuttall seem unable/unwilling to sort out the problems that the council have identified even though BAM are the ones responsible for creating some of them. From the larger issues like the car park for the St. Ives P&R site being built at too shallower an angle resulting in poor drainage and resultant flooding, to the height of signs and poorly built pavements. Its all been one problem after another.

If they can sort out their problems soon then I think the busway might see an opening date this year. Tests have been carried out recently that have seen buses running the full length of the busway, at normal operating speeds, to allow traffic lights and other busway signals to be tried and tested.

David.c
 

mumrar

Established Member
Joined
26 Sep 2008
Messages
2,650
Location
Redditch
This episode is a perfect example of the systemic failures resulting from private industry and having too many cooks involved. Doubtless BAM will have sub-contracted work to someone else, who in turn may have sub-contracted more. All these levels of changeover are each after a profit.

It is a prime example of ineptitude and mismanagement and has been from start until not finished. The budget increases and delays are huge and quite baffling. I also believe the railway should have been the preferred choice for the route. Many will scoff at our abilities in that department too, but I'd remind people that HS1 was delivered on budget, and completed slightly early also!
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Hopefully never, reinstating the railway from Huntingdon-St Ives-Cambridge would have been so much better, would have been useful for EC diversions too.

How much time would it have saved though between Cambridge and Peterborough via Huntingdon then Cambridge to Peterborough via Ely?
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,856
How much time would it have saved though between Cambridge and Peterborough via Huntingdon then Cambridge to Peterborough via Ely?

Hmm, can't tell whether that's for or against my statement, but it could have good time savings for XC stuff, whilst Ely-Peterborough may have low speed limits (I don't know), there's nothing to stop the route via St Ives being 100mph or more... it would also be handy if St Neots was closed for engineering works.
 