• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

The HighLine for Manchester?

Status
Not open for further replies.

AndrewNewens

Member
Joined
24 Jun 2011
Messages
52
Having recently explored the Highline in Manhattan, New York, I wondered if there was any scope to develop a similar scheme anywhere in the UK.

This is a fabulous piece of community action has transformed an abandoned elevated freight line in to an exciting and vibrant walkway through a linear park. It's brilliant.

My immediate thoughts were for the disused viaducts east of Cornbrook towards the former Manchester Central Station. I walked these shorty after closure in 1968 and running parallel to the Metrolink and heavy rail route, the abandoned elevated trackbed could become an important catalyst for further urban renewal in the area. The disused viaducts are probably listed structures, so they might as well be put to good use.

https://www.thehighline.org/

Anyone got suggestions for other sites?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

thenorthern

Established Member
Joined
27 May 2013
Messages
4,711
Where are you thinking of? The best spot I can think of would be the disused viaduct on the former line into Manchester Central station which is parallel to the current Metrolink viaduct.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,412
Location
A typical commuter-belt part of north-west England
My immediate thoughts were for the disused viaducts east of Cornbrook towards the former Manchester Central Station. I walked these shorty after closure in 1968 and running parallel to the Metrolink and heavy rail route, the abandoned elevated trackbed could become an important catalyst for further urban renewal in the area. The disused viaducts are probably listed structures, so they might as well be put to good use.

Carrying on away from the Castlefield area on these viaducts, eventually you will find that the line formation heading towards Cornbrook becomes part of the Manchester Metrolink line system and is still at viaduct high level. I am not sure if such an elevated walkway in such an area would be approved of by those charged with the running of the Manchester Metrolink system in that particular area. There is the cost of health and safety adherences to ensure the track-bed of the disused viaducts are safe to be walked upon.
 

thenorthern

Established Member
Joined
27 May 2013
Messages
4,711
I can see the other viaduct being used by Metrolink in the near future just not sure when.
 

ianhr

Member
Joined
17 Sep 2013
Messages
534
There will be an increase in conflicting movements at Castlefield Jct when the Ordsall chord is completed. Would it be possible to utilise the disused viaduct to create a grade separated junction here? Move the Metrolink tracks onto the currently disused viaduct and run the UP CLC line along the structures currently used by Metrolink and over the junction leading to the Ordsall 'triangle'. A short new curved single track viaduct would then be needed to bring the UP CLC line down towards Deansgate MSJA station with possibly the relocation of the platform there?
 
Last edited:

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,412
Location
A typical commuter-belt part of north-west England
There will be an increase in conflicting movements at Castlefield Jct when the Ordsall chord is completed. Would it be possible to utilise the disused viaduct to create a grade separated junction here? Move the Metrolink tracks onto the currently disused viaduct and run the UP CLC line along the structures currently used by Metrolink and over the junction leading to the Ordsall 'triangle'. A short new curved single track viaduct would then be needed to bring the UP CLC line down towards Deansgate MSJA station with possibly the relocation of the platform there?

Where, exactly, would your platform relocation at Deansgate take place, noting its already elevated position? It seems a lot of work will be required at some considerable expense to effect all your other stated changes. How would these fit in with the forward rail use proposed on completion of the Ordsall Chord project?
 

ianhr

Member
Joined
17 Sep 2013
Messages
534
Where, exactly, would your platform relocation at Deansgate take place, noting its already elevated position? It seems a lot of work will be required at some considerable expense to effect all your other stated changes. How would these fit in with the forward rail use proposed on completion of the Ordsall Chord project?

I am not too sure of the permitted curve radii and gradients but I would suspect that the eastbound platform (at Deansgate) might need to be moved further easy to accommodate a junction.

It seems to me that the Castlefield-Piccadilly section is seriously congested now and will become even more so when York/Leeds-MIA and possibly also Calder Valley/East Lancs-MIA trains are routed this way. New platforms 15 + 16 at Piccadilly will provide some extra capacity by reducing the backing up of eastbound trains waiting for a platform. Nonetheless the route will still be quite inadequate for a robust cross-city corridor given the volume of traffic which could be expected in future.

The whole route really needs a radical re-think, it was cobbled together by BR trying to 'rationalise' their infrastructure (i.e. run down Victoria!) at the same time as increasing connectivity and opening new through journey opportunities.......without spending any money! Manchester Central had already been closed (all the major viaducts connected to the terminal which was the reason for their existence). Then the Piccadilly-Victoria tunnel was given up in favour of the cheapskate tramway scheme.

What could be done to create a high capacity robust and reliable cross-city railway? The expensive option I suppose would be a new line in tunnel. This won't happen and so the only realistic alternative is to make the best of the viaduct route. It really needs to be 4 track throughout but this would involve demolition of quite a lot of property. If the junctions at Ordsall, Windsor Bridge and Castlefield could be grade separated it reduces conflicting movements and increases reliability and reduces running times.

Capacity could also be increased by eliminating the Deansgate stop on the MSJA lines all together. How many people use it? It is served by the adjacent Metrolink stop and historically it was only served by the electric trains to Altrincham anyway (when it was called 'Knott Mill & Deansgate'?).
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
This is a fabulous piece of community action has transformed an abandoned elevated freight line in to an exciting and vibrant walkway through a linear park. It's brilliant.

When you say it's vibrant, do you mean it shakes when you walk on it?
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,633
Location
Nottingham
I am not too sure of the permitted curve radii and gradients but I would suspect that the eastbound platform (at Deansgate) might need to be moved further easy to accommodate a junction.

It seems to me that the Castlefield-Piccadilly section is seriously congested now and will become even more so when York/Leeds-MIA and possibly also Calder Valley/East Lancs-MIA trains are routed this way. New platforms 15 + 16 at Piccadilly will provide some extra capacity by reducing the backing up of eastbound trains waiting for a platform. Nonetheless the route will still be quite inadequate for a robust cross-city corridor given the volume of traffic which could be expected in future.

The whole route really needs a radical re-think, it was cobbled together by BR trying to 'rationalise' their infrastructure (i.e. run down Victoria!) at the same time as increasing connectivity and opening new through journey opportunities.......without spending any money! Manchester Central had already been closed (all the major viaducts connected to the terminal which was the reason for their existence). Then the Piccadilly-Victoria tunnel was given up in favour of the cheapskate tramway scheme.

What could be done to create a high capacity robust and reliable cross-city railway? The expensive option I suppose would be a new line in tunnel. This won't happen and so the only realistic alternative is to make the best of the viaduct route. It really needs to be 4 track throughout but this would involve demolition of quite a lot of property. If the junctions at Ordsall, Windsor Bridge and Castlefield could be grade separated it reduces conflicting movements and increases reliability and reduces running times.

Capacity could also be increased by eliminating the Deansgate stop on the MSJA lines all together. How many people use it? It is served by the adjacent Metrolink stop and historically it was only served by the electric trains to Altrincham anyway (when it was called 'Knott Mill & Deansgate'?).

I think double-decking the viaduct has been considered a couple of times but not in any detail. The stations are the main constraint and the Piccadily alterations will mean alternate trains using alternate platforms there and at Oxford Road. As you mention the Deansgate constraint remains - but I think this is a useful interchange for journeys between the southern Metrolink routes and local stations towards Liverpool. A RUS a few years ago suggested heavy rail platforms at Cornbrook, which would be a better interchange than Deansgate, but I haven't heard any more of that idea.
 

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,350
Location
Yorkshire
A 'linear park' is a great idea, and there are a number of other cities where such a thing would be brilliant... BUT:

One place I've previously heard of such a scheme being suggested is the Holbeck viaduct in Leeds. Though if that viaduct isn't planned to be used or obliterated for HS2, it would in my opinion be better used to carry conventional trains once again, as it would massively increase capacity on the Western approaches to Leeds station, as well as possibly allowing an MUFC Halt style platform for Elland Road.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
35,412
Location
A typical commuter-belt part of north-west England
A RUS a few years ago suggested heavy rail platforms at Cornbrook, which would be a better interchange than Deansgate, but I haven't heard any more of that idea.

The new improved layout of the Deansgate-Castlefield Metrolink stop with its improved access points and the fact that the heavy rail line passing the Cornbrook area is not on the line taken by the Ordsall Chord proposals, coupled with the fact that Deansgate station is on the city centre border makes Deansgate a better interchange option all round these days.
 

davetheguard

Established Member
Joined
10 Apr 2013
Messages
1,939
A 'linear park' is a great idea, and there are a number of other cities where such a thing would be brilliant... BUT:

One place I've previously heard of such a scheme being suggested is the Holbeck viaduct in Leeds. Though if that viaduct isn't planned to be used or obliterated for HS2, it would in my opinion be better used to carry conventional trains once again, as it would massively increase capacity on the Western approaches to Leeds station, as well as possibly allowing an MUFC Halt style platform for Elland Road.

There's one in Paris too, just south of the Gare de Lyon.
 

Gathursty

Established Member
Joined
31 May 2011
Messages
2,649
Location
Wigan
If you look from the platform at Ardwick in the direction of the Etihad Stadium, in the foreground you will see a viaduct which is extremely overgrown. Whilst it is further away from Manchester than Castlefield, I think it is a much better site for a 'highline' park development.
 

kevconnor

Member
Joined
22 Apr 2013
Messages
641
Location
People's Republic of Mancunia
until a few weeks ago there was a self contained one above the soldiers gate at Manchester Victoria, it even developed it own cult status and fan club over on the Manchester Victoria thread on SSC, alas however it is now no more.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Just quickly is Holbeck Viaduct in Leeds the disused railway viaduct that all incoming trains into Leeds see coming from Wakefield Westgate?
 

AndyHudds

Member
Joined
17 Jun 2012
Messages
601
Just quickly is Holbeck Viaduct in Leeds the disused railway viaduct that all incoming trains into Leeds see coming from Wakefield Westgate?

Yes that is indeed the Holbeck Viaduct, if you google the viaduct there has been some exploration of the viaduct with some interesting photos and videos to see. The viaduct is riddled with ginnels under its arches.
 

BantamMenace

Member
Joined
2 Dec 2013
Messages
573
Would deansgate be better if located to a 4 platform formation just after the junction where a proper interchange between CLC-bound, North-west-bound and Ordsall chord-bound trains can interchange fully with Metrolink. This could be done by removing the first span of the old iron viaduct and adding metrolink platforms directly above 2 platforms on the CLC and 2 platforms on the lines towards the proposed chord.

This would allow a similar arrangement to oxford road and piccadilly with trains not stopping on the double track section but instead waiting until it turns four track. (This however would break down slightly with the majority of traffic heading towards the chord and chat moss as oppose to the CLC however a service bound for the chord stopped at this new deansgate interchange wouldn't block services to the CLC or freight to trafford park.)
 

Mutant Lemming

Established Member
Joined
8 Aug 2011
Messages
3,191
Location
London
A shame this idea wasn't proposed for the Great Central in Leicester then maybe some of the more interesting bridges and viaducts may have been saved.


http://www.gcrleicester.info/index.html

Also some remnants around Sheffield Victoria may lends themselves to a smaller version.
 
Last edited:

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,633
Location
Nottingham
Would deansgate be better if located to a 4 platform formation just after the junction where a proper interchange between CLC-bound, North-west-bound and Ordsall chord-bound trains can interchange fully with Metrolink. This could be done by removing the first span of the old iron viaduct and adding metrolink platforms directly above 2 platforms on the CLC and 2 platforms on the lines towards the proposed chord.

Nice idea but I think it would fall foul of signalling overlaps. A train approaching from Cornbrook direction would lock the junction immediately beyond the end of its platform, preventing any train being routed towards Ordsall Lane or the Chord.
 

BantamMenace

Member
Joined
2 Dec 2013
Messages
573
Nice idea but I think it would fall foul of signalling overlaps. A train approaching from Cornbrook direction would lock the junction immediately beyond the end of its platform, preventing any train being routed towards Ordsall Lane or the Chord.

If a Crewe bound LM service is at Stone then can a VT Manchester bound service not pass through on the lines from the Trent valley before the LM service departs then? I can't think of any other examples where a station is so close to a junction which has 4 platforms but the concept is the same at stone.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,633
Location
Nottingham
If a Crewe bound LM service is at Stone then can a VT Manchester bound service not pass through on the lines from the Trent valley before the LM service departs then? I can't think of any other examples where a station is so close to a junction which has 4 platforms but the concept is the same at stone.

Not sure. Sometimes it can be dealt with by restricted overlaps but the train approaching the red then has to be brought down to a low speed by approach control at the previous signal. Sometimes it is permitted under grandfather rights but wouldn't be with new signalling. Also the overlap would "time out" after a period which is long enough that the train must have stopped at the signal or at least be approaching very slowly.

I don't know which if any of these apply at Stone (Kidsgrove would perhaps be similar). But the service frequency is a good deal less than at Deansgate so conflicts are much less likely.
 
Status
Not open for further replies.

Top