I think that the govt/rail industry has finally figured out that the cost of diesel is going to make diesel powered traction very expensive to operate so I wouldn't be surprised to see the wires going up more and more quickly in the years to come.
I will be. If anyone else has been watching, there is a trend in the British railway industry where every thirty years a detailed, high level study is undertaken into the benefits of electrification, lots and lots of miles of electrification are proposed and then about a decade later one main line gets electrified. This has already happened in the fifties, when British Railways were defining the direction of their modernisation plan, which resulted in the WCML being electrified within about a decade, and again at the start of the eighties, which was followed by the electrification of the ECML towards the end of the decade. And now we have a huge set of electrification proposals from Network Rail, that have not all been fully signed off and a general election lies ahead before the less certain schemes can begin to be implemented. I wouldn't be at all surprised if we see the GWML electrified as promised, and then have to wait another thirty years to see the MML get wires.
Suburban and commuter schemes seem to get around this rule quite happily however, and it is those sorts of schemes that will be required to really reduce our dependence on DMUs.
--- old post above --- --- new post below ---
The locos and carriages were literally lying around spare.
I don't recall that they were. I seem to remember that Chiltern were considering implementing loco hauled services before the Wrexham & Shropshire operation was pulled. Which is why there was a Chiltern blue & white liveried DVT running around in Wrexham & Shropshire trainsets for some time before W&S services were withdrawn. If the Wrexham & Shropshire trainsets were spare following the demise of that operation then it wasn't for very long before they were thrown into driver training and route learning for Chiltern.
--- old post above --- --- new post below ---
In fact, there is still plenty of space at Marylebone to allow them to add extra coaches if they wished. The addition of power-operated doors also means they can de-selected coaches if the train ever calls at a station with a short platform.
There's not much space left at Birmingham Moor Street to extend the trains any further, and you can't just de-select carriages there as a longer formation would be beyond the signal and potentially obstructing the neighbouring bay platform. If Chiltern services require additional capacity above the six carriages that are presently provided by the Silver sets then seven or eight carriage DMU formations would be a better idea and would fit within the length of the platform.
--- old post above --- --- new post below ---
DB own Chiltern so any leasing cost is staying in the business
Yes but DB Schenker and DB's British TOCs are still all separate subsidiary companies of DB that have their own books to keep. There will still be leasing charges being paid between the likes of DB Schenker and Chiltern for the hire of locomotives, and I have never seen it proved that DB are providing "mates rates" to their TOCs for these charges either. It is only at the highest level that costs are being kept "in the family".
--- old post above --- --- new post below ---
Are there any emission compliant locomotives out there yet. I know MTU's 4000V version that does comply won't fit in UK stock?
Are the Vossloh Eurolights (Class 68s) non-compliant already, before they have even been built?