Well I thought GWR ran lots of HSTs to Hereford including at weekends? If you compare the cost of infrastructure costs to get 15% more capacity as well as the cost of running more trains also a hell of a lot. The only rational argument for building under capacity is that you won't need it for the next 25 years and I very much doubt that. The long trains model is well established in many other operations. Then you talk of carting around air while boasting about doubling the off peak frequency to Cheltenham?
I haven't claimed localised commuting, in fact I have explained that selling Reading short also sells Didcot, Bristol and everywhere else short too. Given your own anecdotes there seems to be even less reason to be doing this.
On the 800 thread I remember being told what a good idea it would be to split a 2x5 at Oxford in the peak and send 1x5 back to London for a second peak trip. I am glad this isn't the plan and that you agree with me this would not be a good idea.
The likes of Oxford and Newbury should not be IETs at all off peak. That is what 387s and these Flex trains are for.
Yes, GWR does run several HSTs to and from Hereford on weekdays - but apart from the morning trains towards London and the late afternoon/early evening trains the other way, their use has always represented capacity overkill, as would a nine-coach IET, never mind a 10-coach one. But in the absence of more 180s, the HSTs got used all day.
Once the full IET fleet is available, that will no longer be the case, so outside the peaks the chances are five-cars are what will be seen on Hereford services - as has been the case on several of the Sunday workings since January - unless sending a 1x9 makes sense when it come to diagramming through the day, or a service is covering the London-Oxford leg of its journey at a time of higher demand.
In the case of Cheltenham, one of the reasons there has not been an hourly all-day service until now was the lack of trains with an appropriate capacity, rather than an HST, never mind a 700-seat 1x10 IET. The appropriate trains are about to become available in the shape of five-car 800s, hence the improved service for somewhere other than the centre of the universe, aka Reading.
Clarence Yard has pointed out the huge increase there will be in seats on main line services in the peaks as a result of all these changes, never mind any impact Crossrail has on travel habits.
And all that after a detailed look at traffic trends, long-term forecasts, housing growth plans and all the rest.
That work resulted in what is a compromise in terms of future capacity, train sizes and frequencies - a network-wide solution, not one that is all about Reading commuters and blind to any other factors at all, including common sense.
Neatly illustrated by you being quite happy to wish emus on passengers at Oxford (bit hard when half the Paddington fast service all day, and pretty much all of it in the peaks, is from or to the Cotswold Line anyway) and Newbury/Bedwyn, while still demanding that Reading commuters should all be able to get on an intercity train for their 20-minute dash to or from London.