Not good news for the line, from todays local paper. The three hour inspections 24/7 have been confirmed locally.

http://www.leaderlive.co.uk/news/99298/safety-fears-shock-for-crucial-railway-viaduct.aspx



Bob
The damage is done, and may possibly take a bit of remedial work before it is undone. I don't see why this is bad news, it shows a big safety commitment to the line and structure and is the only logical solution to the problem.

It is unfortunate, but it is not bad news for the line.

It does raise a question though, with hundreds of large structures such as this that are 150+ years old, how prepared (financially) are Network Rail for a lot of problems like this in the future?
 

Sir_Clagalot

Member
Joined
9 Aug 2007
Messages
853
what would people rather happen, NR ignore it and either a freight or passenger train plummets when the viaduct collapses underneath it?
 

merlodlliw

Established Member
Joined
8 Mar 2009
Messages
5,852
Location
Wrexham/ Denbighshire /Flintshire triangle
Safety is of course the paramount issue, but if the Cefn can not be repaired soon, the line may loose freight which is improving , the logs is a growing market,but like steel could use other methods, the detours are causing problems with both, and of course we have already lost W/S capacity on the line.

The double tracking just about kept alive,could also suffer as could the loco hauled services proposed for the line by WAG

Safety first of course


Bob
 
Last edited:

TDK

Established Member
Joined
19 Apr 2008
Messages
4,164
Location
Crewe
Safety is of course the paramount issue, but if the Cefn can not be repaired soon, the line may loose freight which is improving , the logs is a growing market,but like steel could use other methods, the detours are causing problems with both, and of course we have already lost W/S capacity on the line.

The double tracking just about kept alive,could also suffer as could the loco hauled services proposed for the line by WAG

Safety first of course


Bob

Loco hauled WAG express via Wrexham - you will be lucky
 

nedchester

Established Member
Joined
28 May 2008
Messages
2,093
From what I hear loco hauled stuff is OK to go over the line now. It was shut to freight pending inspection but from what I hear is now open to all traffic.
 

Rydon

Member
Joined
26 Aug 2010
Messages
11
Steel train went south today over the
viaduct.

I think the report in the local press was some 7 days late
 