cjohnson
Member
- Joined
- 3 Sep 2009
- Messages
- 613
Not sure yet what knock-on impact this will have on the rest of the proposed Thameslink service patterns, but looks like Wimbledon/Sutton services will carry on through beyond Blackfriars after all.
http://www.wimbledonguardian.co.uk/...s_Wimbledon_Thameslink_loop_saved/?ref=twtrec
A bit more on the DfT's website - https://www.gov.uk/government/news/government-safeguards-future-of-the-wimbledon-loop
http://www.wimbledonguardian.co.uk/...s_Wimbledon_Thameslink_loop_saved/?ref=twtrec
--- old post above --- --- new post below ---This morning the Government instructed Network Rail to ensure the service, which runs in a loop from Mitcham Eastfields via Sutton, Wimbledon and Tooting before continuing into central London via Blackfriars and out to St Albans and Bedford remains intact .
It was proposed this route should terminate at Blackfriars which would have forced passengers to disembark and change trains cutting off direct routes from Wimbledon and Sutton to north London, St Pancras International and further afield to Bedford and Luton.
A bit more on the DfT's website - https://www.gov.uk/government/news/government-safeguards-future-of-the-wimbledon-loop
Under the new proposals 8 Thameslink trains will run per hour via Elephant and Castle, including the 4 Wimbledon Loop trains, 2 from Sevenoaks via Bromley South and Catford, and 2 (peak only) from Maidstone East via Bromley South.