Network Rail has issued a Press Notice, publicising what it describes as a preview of the new 12 car services on Thameslink.

Am I missing something? The notice explains that height checks and stepping distance checks were carried out on the new, extended platforms.

Surely, the same checks could have been carried out with a four, or eight car unit and this was simply a publicity stunt?

Or am I missing some important technical element (maybe signal sightings, which doesn't get a mention in the Notice)?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,269
Network Rail has issued a Press Notice, publicising what it describes as a preview of the new 12 car services on Thameslink.

I'd take any Thameslink press release with a large pinch of salt. One of their recent successes is getting the media to report that the Blackfriars northern concourse is complete - but anyone can see from a passing train it is still an empty space...
 

MadCommuter

Member
Joined
4 Oct 2010
Messages
733
I'd take any Thameslink press release with a large pinch of salt...

The opening paragraph says 'a 12 car train has been tested for the first time.' Not true, in the late 80s a 12 car ECS ran from Bedford to Selhurst every Friday evening, poss every weekday evening.
 

12CSVT

Established Member
Joined
18 Aug 2010
Messages
2,611
The opening paragraph says 'a 12 car train has been tested for the first time.' Not true, in the late 80s a 12 car ECS ran from Bedford to Selhurst every Friday evening, poss every weekday evening.

Class 319 units are permitted to run in 12 coach formations on ECS workings but not in passenger service. The test run involved class 377 units.
 

rogkate

New Member
Joined
2 Nov 2009
Messages
1
Hi Kingfisher - and thanks for your interest. We needed to use a 12-car 377 because we had to place the train in the platform to locate the correct stopping point for a 12-car and to sight the signal from this position to ensure the sighting was in line with signal sighting standards.

It is not acceptable to "guess" where it should be by using an 8- or a 4-car unit as we also had to ensure where the rear doors were in relation to the platform length once we had sighted the stop mark and the signal.

By using a 12-car all criteria were checked correctly and as time was important it saved moving a shorter train up and down the platform.

I won't deny that we made good use of the test train to publicise the Thameslink Programme. It's important that people know progress is being made after all the disruption they have been forced to endure.
 
Joined
26 Sep 2009
Messages
556
Location
Bishops Stortford
Hi Kingfisher - and thanks for your interest. We needed to use a 12-car 377 because we had to place the train in the platform to locate the correct stopping point for a 12-car and to sight the signal from this position to ensure the sighting was in line with signal sighting standards.

It is not acceptable to "guess" where it should be by using an 8- or a 4-car unit as we also had to ensure where the rear doors were in relation to the platform length once we had sighted the stop mark and the signal.

By using a 12-car all criteria were checked correctly and as time was important it saved moving a shorter train up and down the platform.

I won't deny that we made good use of the test train to publicise the Thameslink Programme. It's important that people know progress is being made after all the disruption they have been forced to endure.

Many thanks for the update and the useful feedback. It would have been useful to mention the primary reason for the test run in the Release.

You're right about maximising the opportunity though... we all need good publicity and there's enough doom and gloom around at present!
 

boing_uk

Member
Joined
18 May 2009
Messages
619
Location
Blackburn
The vast majority of people dont care about "progress" or publicity or milestones. They are all symbolic. Only the focus groups, passenger forums and the minority who are interested care about such things.

All the vast majority of people want to know is:

:arrow: WHY they are being disrupted
:arrow: HOW and WHEN it will affect them
:arrow: WHEN it will be finished.

Marjorie who pops on the train to her cleaning job is unlikely to give a flying fudge about "test trains" "first times" and all that PR nonsense. All it does is give editors something to fill column inches with.

Since organisations started engaging, consulting, working with "customers" and "stakeholder" - because everyone is a customer and stakeholder in something - everyone seems to be much more expectant of everyone.

Rare, it seems, are the days where people were told "we're doing this, like it or lump it"... or even rarer nowadays the "we're NOT doing this, like it or lump it".

Sorry for the rant.. i shall now go jump to my death from my soap box, to be buried wearing my rose tinted specs. :p:lol:
 

kentuckytony

Member
Joined
23 Aug 2010
Messages
283
Location
Edgewood KY USA
Well, I appreciate Rogkate weighing in and giving what appears to be logical information. No rants from me!
Keep us informed on more developments.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
The vast majority of people dont care about "progress" or publicity or milestones. They are all symbolic. Only the focus groups, passenger forums and the minority who are interested care about such things.

All the vast majority of people want to know is:

:arrow: WHY they are being disrupted
:arrow: HOW and WHEN it will affect them
:arrow: WHEN it will be finished.

Marjorie who pops on the train to her cleaning job is unlikely to give a flying fudge about "test trains" "first times" and all that PR nonsense. All it does is give editors something to fill column inches with.

Since organisations started engaging, consulting, working with "customers" and "stakeholder" - because everyone is a customer and stakeholder in something - everyone seems to be much more expectant of everyone.

Rare, it seems, are the days where people were told "we're doing this, like it or lump it"... or even rarer nowadays the "we're NOT doing this, like it or lump it".

Sorry for the rant.. i shall now go jump to my death from my soap box, to be buried wearing my rose tinted specs. :p:lol:

You do realise that the Thameslink Programme website does exactly that.
Network Rail, FCC and other parties issue out such briefings to the public because it's a massive improvement in the existing system which will deliver more trains which are longer ie 12 cars and even more services.
 

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
There is a picture of the 12 car working in this weeks Railway Herald.
 