So run the service without any recovery whatsoever ? That will just delay multiple services and thousands more passengers. How late should they run a service ? if you already believe that running it 21 minutes late is acceptable then what about 40 ? 50 ?
What about making additional stops ? Is that allowed or should they only run to the booked pattern ? That is what you are suggesting.
Stopping additionally will inconvenience those already on the train. Those people who may be on a platform due to other circumstances will benefit from another service being asked to stop and pick them up.
How do you plan for a 21minute delay ? Again the TOC cannot win here. There will be an accusation of "padding" if time is added for dwell times and recovery time. There will be complaints about longer journeys for no reason, it will destroy any increase in #tph capacity and that generates complaints. How long should a turnaround time be ? 30 minutes ? If you need to plan for a 21 minute delay you need to build that in somewhere. Longer paths and terminals with units sitting there doing nothing "just in case" There has to be a red line drawn somewhere. I fully agree that the timetable is broken and everything is way too tight but building in huge slack for delay recovery just becomes detrimental.
There are a couple of planners on the forum. Maybe you could offer up some suggestions.
In the case of Peterborough, ideally I’d break up the service into 1tph through the core, and 1tph either side. That would offer resilience in that people would only be running the risk of having one service in a row disrupted thanks to Thameslink delays.
Otherwise the other obvious thing to do is to put extra trains (and drivers) in the circuit so that there’s an extra half hour added to every turnaround. I’m not entirely sure if the respective termini are able to readily support this, nor if there’s sufficient trains readily available (although if longer turnarounds could be combined with the 1tph option then there’s 365s sitting in store which could make up the shortfall), however these sorts of things should have been thought about *before* go-live.
If we’re accepting that delays will always happen then the plan should have been more resilient. It wasn’t, and passengers are now paying the price for that failure to plan.
One way or other something has to give. The GN side is not working with not even 3tph through the core, so it’s only going to get worse with 8tph. And lest we remember that the Peterborough service is the most resilient of those on the GN side - it has the slow lines largely to itself north of Hitchin. The Cambridge and Welwyn services are a different ball-game in that respect