Thameslink schedule question

Status
Not open for further replies.

axlrosen

Member
Joined
3 May 2018
Messages
17
Apologies for a very specific question. I'm trying to figure out the frequency of trains from West Hampstead to central London (for example, King's Cross). How many TPH now, and how many when the Thameslink Programme is all done? I tried figuring it out myself from the schedule but I couldn't...

Alex
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

700007

Established Member
Joined
6 May 2017
Messages
1,271
Location
Near a bunch of sheds that aren't 66s.
Hey, don't worry.

If I am right, at the moment it is:
2 trains an hour to Three Bridges
4 trains an hour to Sutton of which;
2 are via Wimbledon
2 are via Mitcham Junction
2 trains an hour to Sevenoaks

That creates an 8tph service at present.

In the new timetable it should be:
2 trains an hour to Gatwick Airport
4 trains an hour to Sutton;
2 are via Wimbledon
2 are via Mitcham Junction
2 trains an hour to Orpington via Crofton Park (does this service start here or Kentish Town?)
2 trains an hour to Rainham Kent via Greenwich

If the service is from West Hampstead, then that boosts to 10tph, if not then it stays at 8tph.

The current Sevenoaks via Crofton Park service will terminate at London Blackfriars from 20th May with the intention of extending it to Welwyn Garden City at selected times from 2019.
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,621
I think Orpington is Kentish Town, except for the peaks when it is Luton/St Albans. Was not aware about the Sevenoaks service - I thought it would continue through the core the whole time...a shame.

I wonder if services like that or indeed the Kentish Town terminators will be extended to Brent Cross once opened, which I had understood to be a bit of a mid-point terminus? But the plans I saw didn't have an extra platform - perhaps instead a turnback? That would really help metro frequencies along that inner stretch.
 

700007

Established Member
Joined
6 May 2017
Messages
1,271
Location
Near a bunch of sheds that aren't 66s.
I think Orpington is Kentish Town, except for the peaks when it is Luton/St Albans. Was not aware about the Sevenoaks service - I thought it would continue through the core the whole time...a shame.

I wonder if services like that or indeed the Kentish Town terminators will be extended to Brent Cross once opened, which I had understood to be a bit of a mid-point terminus? But the plans I saw didn't have an extra platform - perhaps instead a turnback? That would really help metro frequencies along that inner stretch.
Yeah I agree, I think there is a lot of potential to get more people onto ThamesLink if they created a way for trains to turn around at Hendon or Brent Cross. Particularly when Brent Cross South opens.
 

axlrosen

Member
Joined
3 May 2018
Messages
17
So it seems like Thameslink Programme will not increase the frequency of trains at this station, except for an additional 2 tph at peak, is that right? Isn't that surprising?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,260
So it seems like Thameslink Programme will not increase the frequency of trains at this station, except for an additional 2 tph at peak, is that right? Isn't that surprising?
It ought to be 12 tph at West Hampstead after the full ramp up to 16 tph on the MML. That isn’t due until Dec 2019. The above posts seem to be concentrating on next month, which I think isn’t what you originally asked when you wrote “when the Thameslink Programme is all done”?
 
Last edited:

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
also if the query is about Kentish Town to central London there's 24tph peak/20tph off peak to central London... from downstairs.

Plus, what was the frequency before the Thameslink Programme? Ie the old 319 services, calling at King's Cross Thameslink?
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,027
Location
St Albans
The current service between the peaks is 02,20,32,50
So it seems like Thameslink Programme will not increase the frequency of trains at this station, except for an additional 2 tph at peak, is that right? Isn't that surprising?

I'm not sure what you are suggesting that is surprising. 8+ trains per hour off-peak is turn up and go frequency, even by TfL standards, so just how much of the Thameslink Programme should be spent on increasing that.
What the programme has brought though is a significant increase in capacity by replacing the class 319 stock, which at best ran as 8-car trains, (often running as a single 4-car unit even in the peak), with all trains comprising at least 8-cars with many of the fasts having 12-cars.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,712
Service now is 7/8 tph in the up peak, 6/7 tph Down peak, 6tph off peak.

When the MML goes to full TL timetable it will be 8tph all day.

Trains on the fast lines won’t be stopping in the peak.
 