• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Thameslink Railway performance

Status
Not open for further replies.

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,879
Location
UK
The information about the train splitting, and saying you'll have time to change when actually at that station, is a good thing.. but it certainly does mention that over and over. I suppose that's necessary for those who board further up the line, however. It's also good to warn people when stopping at a station that is the last one you can use Oyster at, although some of the warnings just say you might get a penalty fare and don't mention anything about possible prosecution (ironic, given the latter is a lot more profitable!).

By and large, I can't really complain about the information given. It does make things a lot clearer for the irregular travellers. It also makes the 365s seem incredibly archaic - but weren't they going to be updated? Nothing has happened as far as I can see.

As for the volume, it can vary a lot from coach to coach, but I think there might also be ambient noise sensors that adjust the volume - and perhaps they don't work very well. Remember the old Circle line trains where it didn't smoothly adjust the volume and stepped up and down so it could start pretty quiet and then bellow out at max volume without any warning.

And it's mad that even with the latest software update, the system can't detect when it's running in reverse (i.e. it's been left with the diagram from the previous service). After passing one or two stations, the software could easily work out it was wrong and disable future station announcements (and perhaps alert the driver) but, no, you keep getting told the wrong station and that you're approaching as you pass the GPS location where it would be approaching (i.e. just after you left the same station).

I don't know what system it is, but that's a pretty big cock up on the part of the company that built it.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

al.currie93

Member
Joined
27 Jun 2013
Messages
381
The 317s now welcome you aboard the train at every single service and hardly shut up, including details about Oyster, penalty fares, following on Twitter and getting tickets on the website. Most of the screens are still broken or flickering, but I'm yet to be on a train where they've not been in use.

I also noticed today that they had notices about the new car park at Hatfield which had the incorrect URL of greatnorthern.co.uk (and was covered up with white paper) on it. Whoops.

The announcements on some of the 317s get louder during the announcement - not sure if this is a fault or designed to stop people sleeping!

If you get on at the starting station, you get the announcement in full 3 times.
They do now announce that the train will be dividing at Letchworth/Royston/Cambridge etc, but tend to repeat this annoucnement at random intervals along the line.
The other day it wasn't set properly as I was on a train towards Cambridge but the announcements were saying it was the train to Kings Cross - then announcing the previous station just after we had left it, with the announcement getting longer after each stop along the line. one person got on at Stevenage (platform 4) , saw the screen (which was one of the few workign properly!) said next station is Welwyn North (the system thought we were at Knebworth) & promptly got off again.

Welcome to the "wonders" of Southern announcements! We've had to put up with them for years :P if I get a train from Vicky to Ockley I get told that my train is going to Horsham 48 times along the journey...

Yes they do get louder at random points, usually for the "Coach number X of Y" statement.
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,088
Welcome to the "wonders" of Southern announcements! We've had to put up with them for years :P if I get a train from Vicky to Ockley I get told that my train is going to Horsham 48 times along the journey...

Yes they do get louder at random points, usually for the "Coach number X of Y" statement.

they are so bloody frequent that passengers i think have learnt to ignore them.

I just find it strange that with many management who travel on Southern services that they havent got fed up with the amount of announcements.
 

GatwickDepress

Established Member
Joined
14 Jan 2013
Messages
2,588
Location
Leeds
Welcome to the "wonders" of Southern announcements! We've had to put up with them for years :P if I get a train from Vicky to Ockley I get told that my train is going to Horsham 48 times along the journey...

Yes they do get louder at random points, usually for the "Coach number X of Y" statement.
Heaven forbid someone with a nervous disposition get one of those 313s where the announcements vary between "National Trust guide with laryngitis" to "Brian Blessed with stubbed toe"!

Welcome aboard this Southern service to HASTINGS.
 

philjo

Established Member
Joined
9 Jun 2009
Messages
3,016
Not GN's fault but there were Overrunning engineering works preventing northbound services calling at Brookmans park, Welham & green & Hatfield this morning - there were replacement coaches waiting at Potters Bar. There have been overrunning works every Monday for several weeks now.
Southbound services running as normal.

On my GN service this morning there was a ticket inspection - this was announced as a GN/DfT survey - each ticket was checked & logged electronically in a mobile device. I haven't seen them do this before - what are they trying to find out? I assume they were logging destination & ticket type? one of my colleagues further down the train asked & was told they were assessing the proportion of season ticket holders (I would have thought they could have got this from ticket sales data?)
Are they checking usage on specific services (for future timetable changes) or is it in preparation for the Thameslink through services i.e. those who could change to london thameslink tickets or for extension of Oyster ?
 

SPADTrap

Established Member
Joined
15 Oct 2012
Messages
2,355
Not GN's fault but there were Overrunning engineering works preventing northbound services calling at Brookmans park, Welham & green & Hatfield this morning - there were replacement coaches waiting at Potters Bar. There have been overrunning works every Monday for several weeks now.
Southbound services running as normal.

On my GN service this morning there was a ticket inspection - this was announced as a GN/DfT survey - each ticket was checked & logged electronically in a mobile device. I haven't seen them do this before - what are they trying to find out? I assume they were logging destination & ticket type? one of my colleagues further down the train asked & was told they were assessing the proportion of season ticket holders (I would have thought they could have got this from ticket sales data?)
Are they checking usage on specific services (for future timetable changes) or is it in preparation for the Thameslink through services i.e. those who could change to london thameslink tickets or for extension of Oyster ?

Have you not answered your own question? Why wouldn't you believe that answer out of interest? Maybe it was how many ticket types on that service specifically?
 
Last edited:

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
30,879
Location
UK
The disruption is being shown as emergency engineering work, so I guess it isn't if it's been like this for many weeks. Someone hasn't planned the works very well.

GTR has put on buses though.
 

Abpj17

Member
Joined
5 Jul 2014
Messages
1,012
On my GN service this morning there was a ticket inspection - this was announced as a GN/DfT survey - each ticket was checked & logged electronically in a mobile device. I haven't seen them do this before - what are they trying to find out? I assume they were logging destination & ticket type? one of my colleagues further down the train asked & was told they were assessing the proportion of season ticket holders (I would have thought they could have got this from ticket sales data?)
Are they checking usage on specific services (for future timetable changes) or is it in preparation for the Thameslink through services i.e. those who could change to london thameslink tickets or for extension of Oyster ?

Ask the twitter account. TL had those last week - I queried if it was genuine. (The two guys doing it didn't look very familiar with trains; one of them couldn't work out how to open a door between carriages...)

I have a season ticket but wasn't asked where I was planning to get off.
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
Sounds very much like a ticketless travel survey if the DfT were actually in on it - you'd tend to have some bluff rather than say that of course.
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
8,319
Location
Herts
The badges were 'Rail Executive' which is a new thing connected to DfT.
http://www.railwaygazette.com/news/...ent-for-transport-creates-rail-executive.html

and the survey had been outsourced to http://skyhightechnology.com/

In the new order - the DfT (Rail Executive) takes the revenue risk , and the operator takes the cost risk. Hence a series of checks to ensure / see what the level of ticketless travel is. Nothing new in this - it happened before on SE and Greater Anglia amongst others. Seems to have ruffled a few feathers amongst the travellers by all accounts.
 

SF-02

Member
Joined
26 Oct 2008
Messages
477
In the new order - the DfT (Rail Executive) takes the revenue risk , and the operator takes the cost risk. Hence a series of checks to ensure / see what the level of ticketless travel is. Nothing new in this - it happened before on SE and Greater Anglia amongst others. Seems to have ruffled a few feathers amongst the travellers by all accounts.

Doesn't sound much use. On the rare occasions ticket inspectors get on a Southeastern service half the train decamps down through the carriages to avoid the inspectors, before getting off at the next station to catch the next one or waiting it out.
 

DelayRepay

Established Member
Joined
21 May 2011
Messages
2,929
In the new order - the DfT (Rail Executive) takes the revenue risk , and the operator takes the cost risk. Hence a series of checks to ensure / see what the level of ticketless travel is. Nothing new in this - it happened before on SE and Greater Anglia amongst others. Seems to have ruffled a few feathers amongst the travellers by all accounts.

This is, I presume, how Thameslink will measure ticketless travel. They've set themselves targets. If these inspectors find someone without a ticket, what do they do? Would they be followed by an RPI to take the details, or would they just note it within their statistics and carry on?
 

andrewkeith5

Member
Joined
2 Jun 2013
Messages
681
Location
West Sussex
This is, I presume, how Thameslink will measure ticketless travel. They've set themselves targets. If these inspectors find someone without a ticket, what do they do? Would they be followed by an RPI to take the details, or would they just note it within their statistics and carry on?

Good question! If I were in charge I would train the inspectors as RPIs but I suppose it will depend in the results of the ticketless travel checks... In my experience the inspectors haven't yet made it out of first class.

I'll be interested to know whether, with the DfT taking on the revenue risk, they will be responsible for enforcing the penalties involved?
 
Status
Not open for further replies.

Top