Chrisgr31

Established Member
Joined
2 Aug 2011
Messages
1,702
There are intial works going on around the back of the Millwall stadium. Is there any information on what the timetable is, what the current track layout is, what it will be when the works are finished etc in the public domain which will be understandable to the interested commuter who passes by on the train daily and wants to know what is happening outside the window?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,583
There is some stuff on the NR website, but not much.

First major stage at London Bridge is late May, and it is finished in June 2018.

There will be more soon. Watch this space.
 

Ploughman

Established Member
Joined
15 Jan 2010
Messages
3,097
Location
Near where the 3 ridings meet

zoneking

Member
Joined
3 Jul 2009
Messages
283
So will Southern ever be able to re-instate services to Charing Cross? Currently, 8 & 9 are Southern platforms.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
The new 8&9 are high-level platforms. They're needed for SouthEastern services to Charing Cross, because of the increased frequency of Thameslink services, which will include some services currently run into London bridge by Southern. This, plus the SLL going to the ELL, means there's less services that need to use the low level at london Bridge.

So no, Southern won't go back to Charing Cross, not under the current plans.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
So will Southern ever be able to re-instate services to Charing Cross? Currently, 8 & 9 are Southern platforms.

Not intended ever again in the normal timetable. SN reduce to six terminating platforms for good at this May's timetable change, when the peak SN service into London Bridge reduces from the current 27 to 24 tph. (It was 29 tph before the SLL service transferred to LO.)

That also appears to be a temporary 24 tph max, because as far as various RUS documents are concerned the post Thameslink frequency into the bays will only be 20 tph.

(Numbers always subject to change, but that's how the current stage is described by NR in the planning applications.)
 

zoneking

Member
Joined
3 Jul 2009
Messages
283
Ok, thanks. Perhaps the new Thameslink service will call at additional "Southern" stations, (not just BML) but they still won't go to CX.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
The Caterham and Tattenham Corner to London Bridge services (each 2tph off peak) (as well as others) will be transfering to Thameslink services through the core.
 

87015

Established Member
Joined
3 Mar 2006
Messages
5,078
Location
GEML/WCML/SR
when the peak SN service into London Bridge reduces from the current 27 to 24 tph. (It was 29 tph before the SLL service transferred to LO.)
The SLL service did not result in a net reduction of trains into London Bridge - despite the claims that was the reason to get rid - as there are additional 2tph for extended peak periods to Selhurst via Peckham Rye which have replaced the SLL paths.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
The SLL service did not result in a net reduction of trains into London Bridge - despite the claims that was the reason to get rid - as there are additional 2tph for extended peak periods to Selhurst via Peckham Rye which have replaced the SLL paths.

That's exactly why I included the caveat about numbers possibly changing. My figures were lifted from a document made available last summer, but dated 2011, which has presumably been superseded only recently. But it doesn't really alter the basic point about there being some reductions to reflect the lower capacity from May.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
The Caterham and Tattenham Corner to London Bridge services (each 2tph off peak) (as well as others) will be transfering to Thameslink services through the core.

Don't be so sure. Its still to far out to say they will.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,583
The SLL service did not result in a net reduction of trains into London Bridge - despite the claims that was the reason to get rid - as there are additional 2tph for extended peak periods to Selhurst via Peckham Rye which have replaced the SLL paths.

Now I don't know about particular services, but I do know that before last December there were 29 arrivals into London Bridge LL in the SX high peak hour 0800-0900.

Since December, with removal of the 2 SLL services there are 27 arrivals in that hour.

From 28 May, with removal of the 0725? ex Tonbridge (diverted to Victoria), there will be 26 arrivals into 6 platforms in that hour. And this is the most London Bridge LL will have to deal with in an hour.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
I see today's edition of Modern Railways has attempted to explain the track layout changes through London Bridge, but as far as I can work out they've missed out a key route on the 'Southern' side, namely the 'Down Sussex Slow' which ought to provide a non-conflicting route from the terminal platforms for 'Southern' services to pass under the Thameslink route when heading towards New Cross Gate?

All previous layout's I've seen (including all those provided on page one of this thread) have this route alongside the Charing Cross lines, passing under the Thameslink route (the latter lines being designated the Up and Down Sussex Fasts respectively)...

I'm assuming it's just a drawing error in the magazine, as they couldn't operate with this link removed from the real layout?
 
Last edited:

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,583
I see today's edition of Modern Railways has attempted to explain the track layout changes through London Bridge, but as far as I can work out they've missed out a key route on the 'Southern' side, namely the 'Down Sussex Slow' which ought to provide a non-conflicting route from the terminal platforms for 'Southern' services to pass under the Thameslink route when heading towards New Cross Gate?

All previous layout's I've seen (including all those provided on page one of this thread) have this route alongside the Charing Cross lines, passing under the Thameslink route (the latter lines being designated the Up and Down Sussex Fasts respectively)...

I'm assuming it's just a drawing error in the magazine, as they couldn't operate with this link removed from the real layout?

Error in the magazine. Could easily have been prevented if MR had asked NR for the diagrams, or even let on that they were doing the article :roll:
 