Why do trains through Thameslink core switch to AC traction at City Thameslink while going north, but switch to DC at Farrinngdon while going south? As far as I can tell, third rail goes all the way to Farringdon. Surely a minute could be saved by not stopping at City Thameslink when it is closed (Sundays and late evenings). I assume there's some kind of operational reason for the switchover offset. Anyone know what that is?