Way back in 2005 on this site was it was said in this thread
http://www.railforums.co.uk/showpost.php?p=296043&postcount=1
Nine years on I read
http://www.railjournal.com/index.php/europe/new-thameslink-trains-previewed-in-london.html
My Questions, revealing my ignorance, on this wet and windy day:
And do you, more knowledgable types, think it really will all be done and dusted by 2018?
http://www.railforums.co.uk/showpost.php?p=296043&postcount=1
Thameslink trains through central London will drive themselves under plans revealed by the government this week (23 February).
The Department for Transport says the next generation of Thameslink trains, due to enter service from 2012 to support infrastructure enhancements delivered by the Thameslink Programme, will be equipped with Automatic Train Operation (ATO). Drivers will operate train doors and oversee passenger safety but the train driving itself will be handled by computers and high-tech signalling equipment.
Introduction of ATO on the Thameslink route, currently operated by train operator First Capital Connect, will be a first for the UK National Rail network. Various ATO systems are currently used on the Docklands Light Railway and the Jubilee and Victoria Tube lines but the technology is largely untried on Britain's main rail network.
Senior civil servants and rail staff have been forced to consider ATO after it emerged that plans for 24 trains per hour in each direction through central London, as promised by the Thameslink Programme, were insufficiently robust and were unlikely to be deliverable for more than a few hours without delays and disruption. Analysis conducted between April and November 2008 found that punctuality above the 93% public performance measure (PPM) could be achieved with a maximum of 20 trains per hour.
According to the DfT, computer modelling has shown that ATO will deliver approximately four trains per hour more through the central London Thameslink corridor than the best that could be achieved robustly with manual driving and conventional signalling within the limits of professional driving standards. Operational challenges for the core section include steep gradients, low speed limits ands short distances between stations which require trains to be precisely driven to avoid knock-on delays to the next services. Under the ATO plans trains will continue to be driven manually on Thameslink routes beyond central London.
Members of the Crossrail project team will help finalise the technical details of the new Thameslink train fleet in a bid to create a national specification for a high capcity urban train control system.
In a first for the UK National Rail network ministers have agreed for the new Thameslink trains, due to enter service from 2012, to use automatic train operation (ATO) in order to minimise station dwell times and maintain the 24 trains per hour in each direction planned under the Thameslink Programme. Recognising that a similar train design will form the basis of units required for the east-west Crossrail route less than five years later, Crossrail staff will be given a say in how the Thameslink trains should be built.
Nine years on I read
http://www.railjournal.com/index.php/europe/new-thameslink-trains-previewed-in-london.html
The trains will be fitted with automatic train operation for use on the central core section of the route from Blackfriars to St Pancras where trains will run every two to three minutes with station stops of only 30 seconds.
The £6.5bn Thameslink programme is scheduled for completion in December 2018 with the rebuilt London Bridge station and new infrastructure links in north and south London enabling through journeys from Bedfordshire, Hertfordshire and Cambridgeshire to destinations in Kent, Sussex and Surrey.
With up to 24 trains per hour through central London there will be 80% more peak hour seats on the core cross-London section from 2018.
My Questions, revealing my ignorance, on this wet and windy day:
- Is this delay typical of train procurement?
- Is it all down to politics/ government (funding)?
- Will there really be trains driving themselves in the central part?
- May the TOC not buy and operate the trains directly selling them on as needed at the end of the franchise and so save money (a third parties profits) or are they prohibited from doing this?
And do you, more knowledgable types, think it really will all be done and dusted by 2018?